Laserfiche WebLink
» DoorlWindow/Finish Schedules, as applicable <br />» ADA Path of Travel design andlor signage Plan <br />• Structural Engineering <br />» Structural Design and Detailing <br />• Mechanical Engineering & Plumbing <br />Electrical Engineering <br />» Electrical Site Plan to include walkway/parking lot <br />lighting, irrigation. <br />» Photometrics. <br />» Location of panels, switchgear, meters <br />» Schedules <br />Details <br />» Notes, specifications <br />» <br />Plan Check & Permits: Construction drawings shall be in <br />accordance with the 2019 California Building Code and will <br />require review/approval by the City Planning and Building <br />Agency. Additionally, this would be subject to review by the <br />Historic Resources Commission. <br />TASK 5: BID ADVERTISEMENT, CONSTRUCTION <br />ADMINISTRATION, RECORD DRAWINGS: <br />• Bid Advertisement: Consultant shall provide support to the <br />City during the Bidding phase by assisting with questions, <br />requests for informationiclarification, or conflicts arising out <br />of the bidding process. Consultant shall also attend pre -bid <br />meeting, if scheduled. <br />• Construction Administration: Consultant shall provide <br />support to the City during the Construction Administration <br />phase by assisting with questions, requests for information) <br />clarification, and/or reviewing submittals. <br />• Record Drawings/As-built Plans: Upon construction <br />completion, consultant shall incorporate as -built information, <br />as provided by the General Contractor, into the drawing files <br />to provide record drawings for City archives. <br />CITY pF SANTA ANA NEW COMMUNITY CENTER - 23 <br />