My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EVERLEVEL HOLDINGS, LLC (FIRST STREET SLOPE STABILIZATION PROJECT)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EVERLEVEL HOLDINGS, LLC (FIRST STREET SLOPE STABILIZATION PROJECT)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 1:12:11 PM
Creation date
2/7/2023 2:47:39 PM
Metadata
Fields
Template:
Contracts
Company Name
EVERLEVEL HOLDINGS, LLC
Contract #
P 22-1341
Agency
Public Works
Council Approval Date
12/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. To compensate the contractor for chipping the existing PCC fence footings on the NE slope <br /> and cutting the existing 4D fence as-needed (PCO 26). <br /> TOTAL AGREED PRICE = $1,346.65 <br /> 8. To compensate the contractor for the removal of old PCC sidewalk along the NE slope <br /> (PCO 27). <br /> TOTAL AGREED PRICE = $3,280.76 <br /> 9. To compensate the contractor for the removal and replacement of the existing drainage <br /> swale and regrading above the stormwater lift station per the Delta 3 plan set (PCO 28). <br /> TOTAL AGREED PRICE = $44,951.61 <br /> 10.To compensate the contractor for the installation of a stay form and 1-sack slurry <br /> underneath the French drain (PCO 29). <br /> TOTAL AGREED PRICE = $18,067.90 <br /> 11.To compensate the contractor for the additional survey needed for the Delta 3 plan set <br /> (PCO 30). <br /> TOTAL AGREED PRICE = $12,010.00 <br /> 12.To compensate the contractor for saw cutting and abandoning an existing 16" concrete pipe <br /> on the NE slope (PCO 31). <br /> TOTAL AGREED PRICE = $4,892.24 <br /> 13.To compensate the contractor for modifications of the rebar to accommodate various <br /> changes to the depth of the anchor wall (PCO 32). <br /> TOTAL AGREED PRICE= $6,215.05 <br /> 14.To compensate the contractor for the installation of sleeves and relocation of PVC pipes <br /> above the stormwater lift station on the NE slope (PCO 33). <br /> TOTAL AGREED PRICE = $1,934.11 <br /> 15.To compensate the contractor to install 1-sack slurry for under the existing PCC sidewalk <br /> on the NE slope (PCO 34). <br /> TOTAL ESTIMATED PRICE =$2,500 <br /> 16.To compensate the contractor for the removal of existing concrete and materials at the top <br /> of the NE slope per RFI 89 (PCO 35). <br /> TOTAL ESTIMATED PRICE = $40,000 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.