My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EVERLEVEL HOLDINGS, LLC (FIRST STREET SLOPE STABILIZATION PROJECT)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EVERLEVEL HOLDINGS, LLC (FIRST STREET SLOPE STABILIZATION PROJECT)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 1:12:11 PM
Creation date
2/7/2023 2:47:39 PM
Metadata
Fields
Template:
Contracts
Company Name
EVERLEVEL HOLDINGS, LLC
Contract #
P 22-1341
Agency
Public Works
Council Approval Date
12/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17.To compensate the contractor for raising the existing 4D fence gate, adjusting a sewer <br /> manhole, and additional forming costs at the top of the NE slope per RFI 89 (PCO 36). <br /> TOTAL AGREED PRICE = $25,603.25 <br /> 18.To compensate the contractor for a darker blue paint for the north River Lens to match the <br /> south River Lens (PCO 37). <br /> TOTAL AGREED PRICE = $3,007.40 <br /> 19.To compensate the contractor for installation of new sidewalk at the Hathaway Street and <br /> Santa Fe Street cul-de-sacs to mitigate future weed growth and maintenance needs (PCO <br /> 38). <br /> TOTAL ESTIMATED PRICE = $40,000 <br /> 20. To compensate the contractor for installation of additional 8' tall 4D fencing along the NE <br /> slope per the Delta 3 plan set (paid via Bid Item unit price of$250/LF). <br /> TOTAL AGREED PRICE = $91,750 <br /> 21.To compensate the contractor for additional unclassified excavation (paid via Bid Item unit <br /> price of$100/CY). <br /> TOTAL ESTIMATED PRICE = $68,000 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.