My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PALP, INC. dba EXCEL PAVING COMPANY
Clerk
>
Contracts / Agreements
>
P
>
PALP, INC. dba EXCEL PAVING COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 2:49:11 PM
Creation date
4/4/2023 9:28:42 AM
Metadata
Fields
Template:
Contracts
Company Name
PALP, INC. dba EXCEL PAVING COMPANY
Contract #
P 19-6951
Agency
Public Works
Council Approval Date
12/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--� CITY OF SANTA ANA <br /> PUBLIC WORKS AGENCY <br /> CONTRACT CHANGE ORDER <br /> Project Number Project No. 19-6951 Safe Routes to School Davis Elementary Change Order Number 1 <br /> Access Compliance <br /> To Excel Paving Co. Contractor <br /> You are hereby directed to make the herein changes from the plans and speofficatlons or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCL OR CITY MANAGER. <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> EXTRA WORK AT AGREED PRICE <br /> 1. To compensate the contractor for the fire hydrant turnover and buries per PCO #2 dated <br /> September 22, 2023, <br /> AGREED PRICE = $26,297.30 <br /> Schedule Impact:Ten (10)Working Days <br /> 2. To compensate the contractor for the redesign of a Kraken Filterra unit as well as procure <br /> additional material to supplement the new design per PCO #6.1 dated October 29, 2024. <br /> AGREED PRICE = $22,430.00 <br /> Schedule Impact:Ten (10)Working Days <br /> 3. To compensate the contractor for an additional cross gutter surveying at 151h St. and Dresser <br /> St. to maintain proper excess flow, additional survey at Washington Ave. and Spurgeon St., <br /> as well as a revised survey at Penn Way and 15th St. per PCOs #5, #9, and #13 dated <br /> February 1, 2024, May 24, 2024 and July 18, 2024 respectively. <br /> AGREED PRICE = $13,912.50 <br /> Schedule Impact:Twenty(20)Working Days <br /> 4. To compensate the contractor for the landscape removal of trees and shrubs at 151h St. and <br /> Penn Way, install a guardrail system, sawcut meandering sidewalk limits, regrade the <br /> meandering sidewalk per the revised plan, and to mobilize equipment for additional concrete <br /> placement per PCOs #14, and #16.1 dated August 15 and October 3, 2024 respectively. <br /> AGREED PRICE = $38,513.00 <br /> Schedule Impact: Twenty(20)Working Days <br /> 5. To compensate the contractor for mobilization costs for an excavator and a stomper for <br /> additional concrete improvements, sawcut street limits and to mobilize equipment for <br /> concrete placement along Washington and Spurgeon St. per PCOs #10 and #15 dated May <br /> 24, 2024 and August 20, 2024 respectively. <br /> AGREED PRICE = $15,745.00 <br /> Schedule Impact: Fifteen (15)Working Days <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.