My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PALP, INC. dba EXCEL PAVING COMPANY
Clerk
>
Contracts / Agreements
>
P
>
PALP, INC. dba EXCEL PAVING COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 2:49:11 PM
Creation date
4/4/2023 9:28:42 AM
Metadata
Fields
Template:
Contracts
Company Name
PALP, INC. dba EXCEL PAVING COMPANY
Contract #
P 19-6951
Agency
Public Works
Council Approval Date
12/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. To compensate the contractor for additional mobilization costs for striping and installation of <br /> new stop sign posts per PCO #11 dated May 28, 2024. <br /> AGREED PRICE = $3,547.95 <br /> Schedule Impact:Ten (10)Working Days <br /> 7. To compensate the contractor for the removal and reconstruction of an existing manhole at <br /> 14t" St. and Poinsettia St., and to connect to the existing sewer line per PCO #17 dated <br /> September 23, 2024. <br /> AGREED PRICE = $25,750.00 <br /> Schedule Impact:Ten (10)Working Days <br /> 8. To compensate the contractor for the installation of a slurry blanket for an existing shallow <br /> waterline at 1411 St. and Poinsettia St. per PCO#1 S.1 dated October 21, 2024. <br /> AGREED PRICE = $30,375.00 <br /> Schedule Impact:Ten (10)Working Days <br /> 9. To compensate the contractor for time and material worked performed at various locations per <br /> PCO#20 dated December 4, 2024. <br /> AGREED PRICE = $43,420.57 <br /> Schedule Impact: Twenty(20)Working Days <br /> 10. To compensate the contractor for revised striping per PCO#21 dated December 11, 2024. <br /> AGREED PRICE = $17,613.06 <br /> Schedule Impact: Ten (10) Working Days <br /> 11. To compensate the contractor reinstall metal guardrail per revised plan PCO #22 dated <br /> February 4, 2025. <br /> AGREED PRICE = $14,720.00 <br /> Schedule Impact: Ten (10)Working Days <br /> 12. To compensate the contractor for concrete cost impact 5,000 psi mix per PCO #23 dated <br /> February 4, 2025. <br /> AGREED PRICE = $7,189.18 <br /> Schedule Impact: N/A <br /> TOTAL AGREED PRICE = $269,513.56 <br /> Page 2of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.