Laserfiche WebLink
7 of 10 City of Santa Ana Public Works Agency // RFP No. 19-090 On-Call Professional Land Surveying Services <br />Relevant Project Experience <br />Project Name and Location Client Project Status Services Provided Description of Project (Challenges and Solutions)Reference Task Order Team Members <br />Stantec Consulting Services Inc. <br />Cabrillo Park Drive City of Santa Ana Completed 2018 Centerline alignment and right-of-way base mapping; legal descriptions Challenge: legal descriptions were to encompass approximately 70 oddly configured sidewalk pop-outs behind tree wellsSolution: worked with city project manager to develop an efficient geometry that significantly lowered the legal description costs <br />Monica Suter, PE, TE, PTOECity Of Santa Ana - Public WorksDesign Engineering(714) 647-5645Msuter@Santa-Ana.org <br />Tony Cuomo <br />Nutwood/Yale Area Infrastructure Improvements City of Fullerton Public Works Completed (pending county approval of 32 pre-construction corner records) <br />Centerline alignment and right-of-way base mapping; right-of-way to right-of-way design-grade site topography (approx. 8,500'); utility potholing; pre-construction corner records <br />No significant challenges were encountered David Grantham, PECity of FullertonPublic Works - Engineering (714) 738-6853 dgrantham@cityoffullerton.com <br />Greg Sebourn, Tony Cuomo, Jeff Stauffer, John Dominguez, Joe Nelson, Tim Eich, Sue Harris <br />Brookhurst Road and Orangethorpe Avenue Pavement Rehabilitation Projects <br />City of Fullerton Public Works Ongoing Centerline alignment and right-of-way Base mapping; aerial topographic mapping (approx. 7,700'); pre-construction corner records <br />No significant challenges were encountered David Grantham, PECity of FullertonPublic Works - Engineering (714) 738-6853 dgrantham@cityoffullerton.com <br />Greg Sebourn, Tony Cuomo, John Dominguez, Joe Nelson, Tim Eich, Sue Harris, GPSi (subconsultant) <br />Leticia Drive and La Plata Storm Drain Projects (Hacienda Heights)Los Angeles County Department of Public Works <br />Ongoing Geodetic control; centerline alignment and right-of-way base mapping; right-of-way to right-of-way design-grade site topography (approx. 43,000'); record of survey; pre-construction corner records <br />Challenge: LADPW requires that all topographic surveying be processed through Carlson Survey softwareSolution: Stantec purchased necessary software, trained with county personnel, and became proficient with the new software <br />Mark Wittig, PLSSurvey Supervisor I, FCLos Angeles County DPW(626) 458-5144mwittig@dpw.lacounty.gov <br />Greg Sebourn, Tony Cuomo, Jeff Stauffer, John Dominguez, Jamie Bertchume (CHA), Joseph Nelson, Tim Eich <br />Monument Preservation (CC-1567 Zone 1 Residential Overlay) Project City of Huntington Beach, Public Works <br />Ongoing Design and construction related services, conducted field survey to locate and/or establish centerline monuments and their accessories, prepared pre- and post-construction corner records, worked with private and public personnel <br />Challenge: project includes 250 monuments located in the center of residential streets and are scheduled to be disturbed or destroyed by pavement rehabilitation efforts Solution: recovered monuments and tied them out to at leastfour tagged ties. (In cases where monuments or ties were missing,new monuments and/or ties were set.) <br />Joe DerlethCity SurveyorCity of Huntington Beach(714) 536-5431jderleth@surfcity-hb.org <br />Joseph Nelson, Tessie Barriga, Jason Shockley, Tim Eich, Alberto Armas, Alex George <br />On-Call Land Surveying and Mapping Services for Orange County Sanitation District <br />Orange County Sanitation District Completed 2019 Construction staking, corner records, monitoring surveys, site control, boundary surveys, aerial topography, map research, base maps, right-of-way documents <br />No significant challenges were encountered William (Bill) GilbertConstruction Inspection SupervisorOrange County Sanitation District(714) 593-7844bgilbert@ocsd.com <br />Jim Steines, Ray Mansur, Jason Shockley <br />Mira Loma Women’s Detention Center Los Angeles County Department of Public Works, Project Management Division <br />Original Contract 2014; Current work June 2017-ongoing. <br />Surface utility surveying and encumbrance mapping, legal descriptions and plats <br />Challenges: secure facility in Lancaster, somewhat remote; Los Angeles County Department of Public Works is client to California Department of General Services Solutions: developed a right-size budget to allow for scope revisions, clear and timely communication, worked with client to resolve competing interests <br />Alicia RamosSenior Capital Projects Manager Project Management Division II (626) 314-1245 aramos@dpw.lacounty.gov <br />Greg Sebourn, Ray Mansur, Tessie Barriga, Joseph Nelson, Tim Eich, Jason Shockley <br />Old River Leeds Road Los Angeles County Department of Public Works, Project Management Division <br />Completed 9/2017 Topo surveying and control for traffic improvements No significant challenges were encountered Yugal LallSenior Capital Projects Manager Project Management Division II (626) 476-2837 ylall@dpw.lacounty.gov <br />Greg Sebourn, Ray Mansur, Tessie Barriga, Joseph Nelson, Tim Eich, Jason Shockley <br />  <br />  <br />City Council 16 – 285 5/2/2023