<br />Project Name and Location Client Project Status Services Provided Description of Project (Challenges and Solutions)Reference Task Order Team Members
<br />Stantec Consulting Services Inc.
<br />Rancho Los Amigos National Rehabilitation Center Utility and Tunnel Survey
<br />Los Angeles County Department of Public Works, Project Management Division
<br />Ongoing Topo mapping of utilities and tunnels Challenges: confined space for surveying, safety Solutions: adhered to all safe work practices, clear communication with Los Angeles County Department of Public Works
<br />Yugal Lall Senior Capital Projects Manager, Project Management Division II (626) 476-2837 ylall@dpw.lacounty.gov
<br />Greg Sebourn, Ray Mansur, Tessie Barriga, Joseph Nelson, Tim Eich, Jason Shockley
<br />South Whittier Outfall Sanitation Districts of Los Angeles County
<br />Completed 12/2017 Aerial control, topo survey and mapping, manhole surveys, and right-of-way mapping
<br />Challenges: schedule was critical Solutions: well-organized scope with closely managed staff delivered the project within the critical schedule
<br />Michael Tatalovich, Section Head, Sewer Design Section (562) 908-4288 mtatalovich@lacsd.org Robert Gardner, Supervising Designer, Sewer Design Section (562) 908-4288 ext 1615 rgardner@lacsd.org
<br />Greg Sebourn, Ray Mansur, Tessie Barriga, Joseph Nelson, Tim Eich, Jason Shockley
<br />Green Lane Pump Station Sanitation Districts of Los Angeles County
<br />Completed 8/2017 Aerial control, topo survey and mapping, manhole surveys, and right-of-way mapping
<br />Challenges: schedule was critical Solutions: well organized scope with closely managed staff delivered the project within the critical schedule
<br />Michael Tatalovich, Section Head, Sewer Design Section (562) 908-4288 mtatalovich@lacsd.org Robert Gardner, Supervising Designer, Sewer Design Section (562) 908-4288 ext 1615 rgardner@lacsd.org
<br />Greg Sebourn, Ray Mansur, Tessie Barriga, Joseph Nelson, Tim Eich, Jason Shockley
<br />Cabrinha Hearn & Associates Experience
<br />Westside Extension, Segment 1 Los Angeles, CA WEST JV/METRO 10/2013 - Ongoing Horizontal and vertical project control verification and densification survey; exploratory shaft site monitoring; as-built surveys and mapping; advanced utility relocation layout and construction staking; utility plan verifications; monument preservation/restoration, topographic design/as-built mapping; and western station track alignment and platform as-built
<br />Challenges: heavy rail, 9-mile subway extension project under construction; tunneling under heavily populated areasSolutions: as-built mapping provided to accommodate utilities relocation often with less than an 8-hour request window to enable the design/build team to accurately locate utilities for station box/decking design and placement
<br />Joe DeMello LA Metro Director, Construction Management Westside Extension (323) 900-2112 demelloj@metro.net
<br />Camden Cabrinha, Jamie Bertchume, Edward Uribe, Rene Rodriguez, Bernard Xu
<br />GPSi Experience
<br />LADWP 230 KV Scattergood Plan and Profile Los Angeles, CA
<br />Los Angeles Department of Water and Power (LADWP)/Stantec
<br />2/2016 - 3/2016 As subconsultant, provided: photogrammetric mapping 1”=40’, 1-foot contours, orthos
<br />Challenges: LAX is one of the busiest airports in the world with difficult low altitude flying directly in the AP take off zoneSolution: aerial survey and photogrammetric mapping 1”=40’ w/ 1’ CI, 11 linear miles; flight coordination with air traffic control
<br />Tessie Barriga PE Stantec (949) 923-6946 tessie.barriga@stantec.com
<br />Ramon Ramos, Maria Alice Ramos, Paul Hamilton-Rivers
<br />Sediment Augmentation Project Seal Beach CA Fish & Wildlife Services 4/2016 - 5/2016 As prime, provided: photogrammetric mapping 1”=20’, 0.5-foott contours, 4-band orthos
<br />Challenge: revitalization and preservation of the Seal Beach wetlands requiring coordination with multiple Federal agencies, such as USGS and Fish & Wildlife ServicesSolution: aerial survey and photogrammetric mapping 1”=20’ w/ 0.5’ CI, collecting point data using SGM methods whilst still achieving a very high accuracy set of mapping deliverables along with four-band digital orthophotography
<br />Kirk Gilligan, Refuge Manager Fish & Wildlife Services (909) 982-4601 kirk_gilligan@fws.gov
<br />Ramon Ramos, Maria Alice Ramos, Paul Hamilton-Rivers
<br />
<br />
<br />City Council 16 – 286 5/2/2023
|