My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-05-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Agenda Packet_2023-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2023 5:08:31 PM
Creation date
4/26/2023 4:57:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/2/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1601
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />EXHIBIT A – SCOPE OF WORK <br /> <br />PROJECT DESCRIPTION <br />David Evans and Associates, Inc. (Client) in collaboration with the City of Santa Ana seeks professional <br />design services for the development of a concrete skatepark at 10th and Flower Park in Santa Ana, <br />California. <br /> <br />PHASE 1 – DESIGN DEVELOPMENT <br /> <br />Task 1.1 Project Kick-Off Meeting – Spohn Ranch and the Client will kick-off the project via an in-person or <br />virtual meeting. We will review the project goals, project schedule and points of coordination. <br />• Task 1.1 Deliverable <br />o Meeting Minutes (PDF) <br />Task 1.2 Information Gathering & Review – During the Project Kick-Off Meeting, Spohn Ranch and the <br />Client will take stock of existing site data, studies and any other information pertinent to the project and <br />project site. We will review existing information and work with the Client to collect additional information <br />as necessary. The site information typically required to begin design work is as follows: <br />• Site survey (AutoCAD) <br />• As-built drawings <br />• Geotechnical report <br />• Any master plan design work or future improvements planned for the site <br />• Any local, state or federal design requirements <br />Task 1.3 Site Walkthrough – Spohn Ranch and the Client will conduct a site walkthrough to review existing <br />conditions, photograph the site and discuss opportunities and constraints. <br />• Task 1.3 Deliverable <br />o Walkthrough Minutes (PDF) <br />Task 1.4 75% Design Development – Incorporating feedback from the Project Kick-Off Meeting, Spohn <br />Ranch will prepare a conceptual design. Conceptual design will address footprint, access, circulation, <br />spacing, elevations and terrain sections, but not detail the specific dimensions of every obstacle. <br />• Task 1.4 Deliverable <br />o 3D Renderings (JPEG) <br />o Labeled & Scaled 2D Site Plan (PDF) <br />o Construction Cost Estimate (PDF) <br />o 2D Base (AutoCAD) <br />Task 1.5 75% Design Development Review Meeting – Spohn Ranch will lead a virtual meeting with the <br />Client and other relevant stakeholders to present the conceptual design and solicit feedback. <br />• Task 1.5 Deliverable <br />o Meeting Minutes (PDF) <br /> <br /> <br />City Council 17 – 66 5/2/2023
The URL can be used to link to this page
Your browser does not support the video tag.