My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-05-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Agenda Packet_2023-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2023 5:08:31 PM
Creation date
4/26/2023 4:57:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/2/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1601
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Task 1.6 100% Design Development – Incorporating feedback from the 75% Design Development Review <br />Meeting, Spohn Ranch will refine the conceptual design to a 100% Design Development level. <br />• Task 1.6 Deliverable <br />o 3D Renderings (JPEG) <br />o Labeled & Scaled 2D Site Plan (PDF) <br />o Construction Cost Estimate (PDF) <br />o 2D Base (AutoCAD) <br /> <br />PHASE 2 – CONSTRUCTION DOCUMENTS <br /> <br />Task 2.1 Construction Documents Kick-Off Meeting – Spohn Ranch will lead a virtual meeting with the <br />Client to review 100% Design Development, special requirements and points of coordination. <br />• Task 2.1 Deliverable <br />o Meeting Minutes (PDF) <br />Task 2.2 90% Construction Documents – Spohn Ranch will prepare professional construction documents <br />detailing the skatepark-specific site improvements. <br />• Task 2.2 Deliverable (PDF & AutoCAD) <br />o Information Plan <br />o 3D Perspective <br />o Layout Plan <br />o Steel Plan <br />o Jointing Plan <br />o Grading & Drainage Plan <br />o Sections <br />o Construction Details <br />o Technical Specifications <br />The Client will provide a title block and site base in AutoCAD format. Spohn Ranch will coordinate with the <br />Client on other aspects of the construction documents such as access pathways, landscaping, etc. <br />Task 2.3 90% Construction Documents Review Meeting – The Client will review the 90% Construction <br />Documents submittal and prepare redline comments. Spohn Ranch will lead a virtual meeting with the <br />Client to review the redline comments and identify actions necessary to address the comments. <br />• Task 2.3 Deliverable <br />o Meeting Minutes (PDF) <br />Task 2.4 100% Construction Documents – Spohn Ranch will incorporate feedback from the 90% <br />Construction Documents Review Meeting and prepare a 100% Construction Documents submittal sealed by <br />a CA-licensed structural engineer. <br />• Task 2.4 Deliverable <br />o 100% Construction Documents (PDF & AutoCAD) <br /> <br /> <br />City Council 17 – 67 5/2/2023
The URL can be used to link to this page
Your browser does not support the video tag.