Laserfiche WebLink
City of Santa Ana RFP 23-025 Page A1-6 <br /> <br />Construction Plans. Standard Specifications and Estimate (PS&E) <br />Preliminary Design· Attend project scope meeting with City Staff to review project details. Consultant shall field review, inspect and conduct all necessary surveys to prepare a Preliminary <br />Design Repor t (PDR) or alternatives, preliminary cost estimate and preferred alternative as <br />requested by the project manager. <br /> <br />A (PS&E) package shall be submitted to re view at 30% design for independent City review. <br />A (PS&E) package shall be submitted to review at 60% design for independent City review. <br /> A (PS&E) package shall be submitted to review at for 100% FINAL independent design review. <br />The City will review and comment on the PS&E packages with a turnaround goal of (2) weeks. <br />One (1) copy of the documents with comments will be returned to the consultant. Unless, several agencies are involved in the review process multiple documents with comments will be provided <br />to the consultant. <br /> <br />After the fin al design comments have been incorporated the consultant shall provide the City with f in al (PS&E) package ready for bid. See Section - General Requirements and Project <br />Deliverables Section. <br />Project Schedule and Progress: <br />Progress review meetings shall be held at intervals deemed appropriate by the City. The Consultant shall furnish two copies of all completed work or partially completed update/status <br />since the last progress review meeting. Progress reports shall be submitted monthly in <br />electronic format indicating achievements 1md project schedule progress. <br /> <br />City Responsibilities: <br />The City will provide information in its possession relevant to the preparation of the required information in the RFP. The City will provide only the staff assistance and the documentation <br />specifically in referred to herein. <br /> <br />• Furnish scope of work and provide general direction as needed for the assigned project <br />• All plan check coordination within the City <br />• Advertise, award, and administer of construction contract <br />• Electronic files (sample plans & specifications, City of Santa Ana's CADD Standards) <br />• Electronic files for title sheets and sheet borders <br />• Facilitate meeting space and coordination and City facilities <br /> <br />Fee Proposal: <br />In addition to Section IV.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall be structured as follows: <br />  <br />  <br />City Council 19 – 20 5/2/2023