My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-05-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/02/2023 Regular & HA
>
Agenda Packet_2023-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2023 5:08:31 PM
Creation date
4/26/2023 4:57:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/2/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1601
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana RFP 23-025 Page A1-6 <br /> <br />Construction Plans. Standard Specifications and Estimate (PS&E) <br />Preliminary Design· Attend project scope meeting with City Staff to review project details. Consultant shall field review, inspect and conduct all necessary surveys to prepare a Preliminary <br />Design Repor t (PDR) or alternatives, preliminary cost estimate and preferred alternative as <br />requested by the project manager. <br /> <br />A (PS&E) package shall be submitted to re view at 30% design for independent City review. <br />A (PS&E) package shall be submitted to review at 60% design for independent City review. <br /> A (PS&E) package shall be submitted to review at for 100% FINAL independent design review. <br />The City will review and comment on the PS&E packages with a turnaround goal of (2) weeks. <br />One (1) copy of the documents with comments will be returned to the consultant. Unless, several agencies are involved in the review process multiple documents with comments will be provided <br />to the consultant. <br /> <br />After the fin al design comments have been incorporated the consultant shall provide the City with f in al (PS&E) package ready for bid. See Section - General Requirements and Project <br />Deliverables Section. <br />Project Schedule and Progress: <br />Progress review meetings shall be held at intervals deemed appropriate by the City. The Consultant shall furnish two copies of all completed work or partially completed update/status <br />since the last progress review meeting. Progress reports shall be submitted monthly in <br />electronic format indicating achievements 1md project schedule progress. <br /> <br />City Responsibilities: <br />The City will provide information in its possession relevant to the preparation of the required information in the RFP. The City will provide only the staff assistance and the documentation <br />specifically in referred to herein. <br /> <br />• Furnish scope of work and provide general direction as needed for the assigned project <br />• All plan check coordination within the City <br />• Advertise, award, and administer of construction contract <br />• Electronic files (sample plans & specifications, City of Santa Ana's CADD Standards) <br />• Electronic files for title sheets and sheet borders <br />• Facilitate meeting space and coordination and City facilities <br /> <br />Fee Proposal: <br />In addition to Section IV.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall be structured as follows: <br /> <br /> <br />City Council 19 – 20 5/2/2023
The URL can be used to link to this page
Your browser does not support the video tag.