Edward C. Yang, P.E., Assoc DBIA <br />Glendale, Refurbishment of the HTP ATF-BTF Odor Control System, DCT AWPF Brine Line <br />Analysis, HTP Odor Neutralization and Testing, Installation and Testing of HTP Linde Air <br />Separation Units, and managing a key sub -consultant for APWWF Optimization and Training at <br />TITP. Served as Resource Manager for LASAN's OneWater Program providing as -needed <br />staffing augmentation. <br />On Call Services, City of Pasadena Water & Power, Pasadena, CA I Principal in Charge <br />Kennedy Jenks is completing a three-year $3 million on -call engineering contract with the City <br />of Pasadena. We were the only consultant to be selected for a contract by the City. The scope <br />of services for the contract encompasses all types of engineering services from planning <br />through construction support for all of the City's water facilities, including 500 miles of pipelines <br />ranging from 2-inch to 42-inch in diameter, 23 pressure zones, 23 storage reservoirs,19 pump <br />stations, and 18 groundwater wells. The largest project developed from the Agreement is the <br />replacement of the 11 MG Sunset Reservoir. <br />Regional WRF Master Plan, Elsinore Valley Municipal Water District, Lake Elsinore, CA <br />QA/QC Reviewer <br />Assisted in the preparation of a Wastewater Facility Master Plan to determine the future <br />direction of the Elsinore Valley Municipal Water District (EVMWD) Regional Wastewater <br />Reclamation Facility (RWRF). The RWRF was originally constructed as an extended aeration <br />oxidation plant, and has continued to expand with the same technology to its current 8 mgd <br />capacity. The master plan addressed the critical decision of whether to continue with the <br />extended aeration (High SRT oxidation ditch) secondary plant, or switch to one of the more <br />conventional activated sludge processes. <br />On -Call Recycled Water Engineering, Inland Empire Utilities Agency, Fontana, CA I Contract <br />Administrator, Principal -in -Charge, Project Manager <br />Contract Manager for the 3-year $15,000,000 as needed engineering contract. Responsibility <br />includes supporting the agency in developing scope and fee proposals for various water, <br />wastewater, and recycled water projects. In addition to wastewater and water process design, <br />general discipline engineering is also provided. Oversaw the development of a preliminary and <br />final design report for recharge, extraction, pumping, storage, and conveyance facilities. Design <br />of a two-mile, 16-inch PVC, groundwater transmission line and related well extraction facilities to <br />deliver up to 8,000 Ac-ft of groundwater from a local well site to the CRA intake at the Hinds <br />Pumping Plant. The project also included the design and construction of a 24-inch diameter, <br />1,000 ft deep groundwater well at MWD's Hayfield groundwater basin. <br />As -Needed Design Production Support, Metropolitan Water District, CA I Contract <br />Administrator, Principal -in -Charge, Project Manager <br />Since 2005, has overseen the planning, scheduling, resounding, and delivery of over 200 Capital <br />Improvement Projects for MWD. These projects encompass all aspects and disciplines of <br />planning and design services for MWD, including the resourcing and management of design <br />staff augmentation teams, the management of specialty environmental subconsultants to <br />support EIR, CEQA and NEPA projects and the management of home office teams executing <br />standalone projects. Projects included evaluation and study of floating reservoir covers, water <br />treatment/process design for very large treatment facilities, in -plant structural, mechanical and <br />electrical upgrades, fire protection analysis of Metropolitan's hydroelectric plants, water quality <br />study of Lake Perris and the design and construction of large diameter transmission mains. <br />