Laserfiche WebLink
Kajori Purkayastha, P.E. <br />months, development, coordination, and execution of the preliminary design report, and 30% <br />and 60%design drawings. <br />Sunset Groundwater Treatment Facility Final Design, Pasadena Water and Power, Pasadena, <br />CA I Project Engineer <br />Process mechanical engineer for design of centralized GAC and IX facility treating 1,2,3-TCP <br />and perchlorate for four wells (total flow 3,000 gpm). Supported disinfection facility design <br />development. <br />Wells 9,19,23, AND 24 PFAS Treatment Systems, Orange County Water District, Final Design <br />and ESDC, Orange County Water District, City of Orange, CA I Project Engineer <br />Responsible for development and execution of final design drawings and coordination of bid and <br />construction phase services for wellhead treatment of PFAS for four wells, which includes Ion <br />Exchange treatment of wells rated 1,400 to 2,500 gpm as well as cartridge filtration upstream of <br />Ion Exchange treatment. In addition to multi -discipline coordination during final design, bid, and <br />construction phases, served as the processtmechanical lead for the project. <br />Well Q2 Perchlorate Removal Facility Final Design, Santa Clarita Valley Water Agency, Santa <br />Clarita, CA I Project Engineer <br />The Well Q2 treatment facility has a capacity of 1,200 gpm. Raw water from Q2 well also <br />contains perchlorate sampled above the California MCL. IX was considered due to the space <br />savings compared to GAC, effectiveness of removing both long -and short chain PFAS <br />chemicals, as well as the ability to address other contaminants, such as perchlorate in the raw <br />water. <br />PFAS Groundwater Treatment Project (N•Wells) and Well Q2 Perchlorate Removal Facility, <br />Santa Clarita Valley Water Agency, Santa Clarita, CA I Project Engineer <br />N-Wells PFAS Treatment facility includes ion exchange treatment system consisting of three <br />lead -lag IX trains with PFAS selective resin designed to treat 2,000-gpm each, and three high - <br />rate cartridge filters with 12, 6-inch diameter filter elements each. Final design also included <br />1,200 glom Well Q2 perchlorate removal facility which consisted of one lead -lag IX train with <br />Perchlorate selective resin. Project delivery included pre -purchasing long -lead items such as IX <br />Systems and pre -filters, pre -selecting OSHGS and chemical systems. Agency self -performing <br />some work for Q2 site, and pre -purchasing the IX resin. <br />Preliminary Design Services for Well 205 Perchlorate Removal Facility, Santa Clarita Valley <br />Water Agency, Santa Clarita, CA I Engineering Support <br />Planning and preliminary design of a wellhead Groundwater Treatment Facility for SCV Water's <br />Well 205 with a treatment capacity of 2,700-gpm. Assessed perchlorate and TCE treatment <br />alternatives including IX, PTA, and GAC. Developed preliminary design for GAC and IX system, <br />including pre -filters and chemical area for removal of perchlorate and TCE from the <br />groundwater. <br />Groundwater Supply Project and Regional Groundwater Storage and Recovery Project, San <br />Francisco Public Utilities Commission, San Francisco, CA I Project Engineer <br />Conducted evaluation of treatment alternatives for removal of nitrate, hexavalent chromium, and <br />various VOCs from several groundwater wells in the city of San Francisco. Assisted with <br />process selection, facility sizing, and conceptual cost estimates. <br />