My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC CONSULTING SERVICES, INC. (4)
Clerk
>
Contracts / Agreements
>
S
>
STANTEC CONSULTING SERVICES, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:53:51 AM
Creation date
5/3/2023 3:20:57 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC CONSULTING SERVICES, INC.
Contract #
A-2023-053-02
Agency
Public Works
Council Approval Date
4/4/2023
Expiration Date
4/3/2026
Insurance Exp Date
10/1/2024
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 22-133 <br />ON -CALL ENGINEERING DESIGN SERVICES FOR PEAS TREATMENT SYSTEMS <br />f. Final section views <br />g. Final plans of mechanical rooms <br />h. Final control diagrams including control point list and final sequence of <br />operation <br />I. Final building components "U" value calculations <br />j. Final mechanical details <br />k. Final energy code calculations <br />VI. Electrical System <br />a. Lighting and receptacles circuited <br />b. Special electrical equipment circuited <br />c. Final panel schedules — showing balanced loads <br />d. Final arc flash analysis <br />e. Final electrical fixture schedule <br />f. Complete one -line diagrams which are directly applicable to the panel <br />schedule <br />g. Final electrical details <br />h. Final electrical load calculations including emergency generator system <br />VII. Instrumentation and Control System <br />a. Final control schematics <br />b. Final security and access control plans <br />c. Final location of alarm devices determined <br />d. Final PLC/DCS wiring diagram <br />e. AC/DC power distribution wiring diagrams <br />3. BID PHASE <br />Upon completion and approval of the 100% design phase, the City shall request the Consultant <br />to assist with the bidding phase. <br />A. PROJECT MANAGEMENT <br />The Consultant shall coordinate and expedite the preparation, assembly and delivery of bid <br />documents for the City to administer via PlanetBids Portal. The Consultant shall take the <br />necessary procedures to administer any prequalification of potential Construction <br />Contractors as directed by the City to ensure that all Contracts are competitively bid. <br />B. TECHNICAL SUPPORT <br />The Consultant shall provide technical support to the City on questions regarding the <br />meaning and intent of the drawings and specifications, and shall assist in achieving the <br />resolution in clarifying any comments potential Construction Contractors may have during <br />the bidding phase. <br />City of Santa Ana RFP 22-133 <br />On -Call Engineering Design Services for PFAS Treatment Systems <br />Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.