Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO.: 22-133 <br />ON -CALL ENGINEERING DESIGN SERVICES FOR PEAS TREATMENT SYSTEMS <br />make recommendations to the City when work is ready for final inspection. Upon request, <br />the Consultant shall assist the City in conducting final inspections. <br />D, CODE COMPLIANCE <br />All materials and workmanship shall be in strict conformity with federal, state and local codes, <br />requirements, standards of the latest editions, and guidelines including revisions of the following: <br />• California Building Code (CBC) <br />• American National Standards Institute (ANSI) <br />• American Society of Testing and Materials (ASTM) <br />• Department of Transportation (DOT) <br />• California State Water Resources Control Board <br />• Department of Drinking Water <br />• South Coast Air Quality Management District (SCAQMD) <br />• Environmental Protection Agency (EPA) <br />• Occupational Safety and Health Administration (OSHA) <br />E. PROJECT MANAGEMENT AND COORDINATION <br />When a request for service is Issued to the City, the Consultant shall issue an estimate to the <br />City's designated Project Manager. The Consultant shall not proceed with any work without the <br />approval of the City's designated Project Manager in the form of a Notice to Proceed. <br />Consultants shall invoice the City on a monthly basis for all work performed during the period or <br />provide a one-time invoice at the completion of work issued, Each invoice shall be accompanied <br />by a summary of tasks performed, contract agreement number, results and progress on long- <br />term tasks if any. <br />F. VALUE ADDED RELATED SERVICES <br />The Consultant may propose additional related services that the City has not specifically <br />identified in this RFP to accomplish the stated goals of this RFP. Value added related <br />services will be considered by the City and may or may not be incorporated in the agreement. <br />All parts and materials must be supplied new and factory approved. <br />G. MARKUP <br />The following markup percentages shall be added to the Consultant's s costs and shall <br />constitute the markup for all overhead and profits (to the sum of the costs and markups, one <br />(1) percent shall be added as compensation for bonding): <br />1) Labor................................................................................................20 <br />2) Materials...........................................................................................15 <br />3) Equipment Rental............................................................................. 15 <br />City of Santa Ana RFP 22-133 <br />On -Call Engineering Design Services for PEAS Treatment Systems <br />Page 21 <br />