Laserfiche WebLink
James Cathcart PE, F.ASCE <br />Project Manager/Principal Agent <br />45 years of experience - Irvine, California <br />Jim has 45 years of experience in water supply and development in California. He has been responsible for 14 <br />well equipping and/or wellhead treatment design projects, as well as numerous pipeline and pump station <br />designs. Jim has also conducted several groundwater treatment studies for wellhead water quality compliance. <br />He specializes in the planning, design, and construction management of water, wastewater, and reclamation <br />infrastructure; master planning; ground- and surface -water treatment; pumping and storage; and pipeline design. <br />Jim has provided expert witness services for water system design and groundwater contamination issues. <br />EDUCATION <br />MS, Civil Engineering, California State University at <br />Long Beach, Long Beach, California <br />BS, Civil Engineering, State University of New York at <br />Buffalo, Buffalo, New York <br />CERTIFICATIONS & TRAINING <br />Fellow, American Society of Civil Engineers, <br />Irvine, California <br />REGISTRATIONS <br />Professional Engineer #C31518, California <br />Professional Engineer#CE014350, Nevada <br />PROJECT EXPERIENCE <br />On -Call Consulting Services for PFAS Treatment <br />Systems Design I Orange County Water District <br />Santa Ana, California I Project Manager <br />Jim is leading a similar staff and subconsultant team <br />for four wellhead treatment sites for the City of Santa <br />Ana. Work includes preliminary design, final design, <br />bid phase support, engineering services during <br />construction, and part time inspection services. Sites <br />include Well 40 currently in construction, Well 38 <br />finishing final design, Well 31 in predesign, and Wells <br />27 and 28 in preliminary design. <br />San Fernando Basin Groundwater Remediation <br />Los Angeles Department of Water & Power (LADWP) <br />Los Angeles, California I QA/QC <br />Jim conducted the independent QA/QC review for this <br />progressive design -build project of two new <br />groundwater treatment facilities of 38 MGD and 25 <br />MGD. The project is part of a comprehensive, long- <br />term plan being pursued by the LADWP to replenish <br />and store contaminated groundwater at sites across <br />the 175-square-mile San Fernando Basin. <br />Suburban Water Systems I Benicia Water Treatment <br />Plant* I Whittier, California I Project Engineer/ <br />Project Manager <br />Jim conducted a water supply investigation and plan <br />for Suburban Water Systems that was followed by the <br />design of a 14-MGD groundwater treatment system <br />for the USEPA as part of the San Gabriel Basin <br />Superfund Cleanup program. Process trains included <br />air stripping, vapor -phase Granular Activated Carbon <br />(GAC) treatment and steam regeneration of the GAC <br />for several groundwater contaminants Including TCE, <br />PCE, and CTC. The design also included a 14-MGD <br />pump station. <br />Perchlorate Treatment Plant Design -Build* I City of <br />Pomona I Pomona, California I Design QC Manager <br />Jim was the design QC manager for a high -capacity <br />single -pass ion exchange (IX) plant at the City AEP <br />facility.. along with new bypass and pumping facilities <br />upstream and downstream of AEP treatment. The <br />project included permitting; providing a bypass of the <br />existing AEP systems for approximately 3.7 MGD <br />consisting of booster pumps, bag filters and <br />associated piping, connections, instrumentation and <br />controls: and combining effluents from the new <br />bypass and AEP systems and directing a total of 16.6 <br />MGD to the new perchlorate treatment plant, <br />including booster pumps, associated piping, <br />connections, instrumentation. monitoring and <br />controls. <br />Air Stripper/Nitrate Blending for Wells 7 and 8B* I City <br />of Pomona I Pomona, California I Principal -in -Charge <br />Jim assisted in the preliminary design report and <br />conducted all design reviews for facilities. including a <br />chloramination disinfection system housed in a <br />chemical storage and feed pump building, wet well <br />modifications, two existing low -lift booster pumps and <br />space for a third pump, motor controls. <br />instrumentation. SCADA system integrationand <br />miscellaneous site piping. He also coordinated with <br />the California DHS to bring the project on-line <br />successfully. <br />Baldwin Park Treatment System* I San Gabriel Basin <br />Water Quality Authority I San Gabriel, California <br />Project Manager <br />Jim managed preparation of a remedial action plan, <br />risk assessment, health and safety plan, Negative <br />Declaration, and institutional/financial analysis for the <br />`denotes pmjecfs completed with other firms <br />City of Santa Ana On Call Engineering Design Services for PEAS Treatment Systems i N0. 22-133 A-7 <br />