Laserfiche WebLink
San Gabriel Basin Water Quality Authority Project No. <br />2. The project involved local wellhead treatment for <br />VOC contamination in the San Gabriel Basin <br />Superfund Site. <br />Groundwater Treatment Plant Review* I City of South <br />Gate I South Gate, California I Project Manager <br />Jim managed a design peer review for two VOC <br />groundwater treatment plants using spray aeration. <br />One plant was a new 5-.MG buried concrete reservoir, <br />Pump station, and chlorination facility. The second <br />was a spray aeration system retrofit of an existing <br />steel tank. <br />Groundwater Treatment Plant* I Nuevo Water <br />Company I Nuevo, California I Principal -in -Charge <br />Jim was responsible for designing a groundwater <br />production well treatment system for H2S <br />contamination. The treatment system consisted of an <br />air stripping tower and chemical feed systems for <br />raising and lowering pH. <br />Park Water Company I Treatment Alternatives <br />Analysis*j Downey, California I Project Engineer <br />As project engineer, Jim supervised a treatment <br />alternatives analysis and preliminary capital and <br />operations and maintenance cost analysis for <br />removing radon from Park Water Company <br />groundwater wells as part of a response to USEPA's <br />proposed Radon Rule, <br />Well 22B Treatment System* I City of South Gate <br />South Gate, California I Project Manager <br />Jim assisted the City in reviewing vendor plans for <br />start-up and operation of Well 22B treatment system <br />using ozone and UV light to remove volatile organic <br />compounds from the well. His assistance included <br />reviewing disinfection options, reviewing start-up and <br />testing plans, and assisting with DHS permitting of the <br />new treatment facility. <br />City of Ontario I As -Needed Services* I Ontario, <br />Califomia I Project Manager <br />Jim provided as -needed consulting services to the <br />City, including water quality data review, DHS <br />correspondence, surface water treatment plant <br />upgrade evaluation, and reviewing nitrate blending <br />plans for City wells. <br />City of Monrovia I Groundwater Quality Study* <br />Monrovia, California I Project Manager <br />Jim managed a groundwater quality study and VOC <br />treatment alternatives analysis for the City. The <br />preliminary report reviewed air stripping, roto <br />stripping, and GAC treatment processes. <br />Cities of Manhattan Beach, Camarillo, and Fullerton <br />Well Equipping Designs* I California I Project <br />Engineer/Manager <br />Jim designed potable water well pump systems for <br />the Cities of Manhattan Beach, Camarillo, and <br />Fullerton. <br />US Navy I Well and Treatment System Design* I Port <br />Hueneme, California I Project Engineer <br />Jim designed an 1,100-foot-deep water well, which <br />included drilling specifications for a 1,500-GPM- <br />capacity well. Equipment design included a 100-HP <br />motor, discharge piping, and chlorination system and <br />expansion of an existing iron/manganese water filter <br />plant. <br />Wellfield Rehabilitation Study and Design* I City of <br />Whittier I Whittier, California I Project Manager <br />Jim led a study that involved a review of existing well <br />casing, pump and motor condition for well depth, size <br />of casing and screen, capacity, and type of driver. He <br />evaluated pump tests and well inspection video <br />surveys. The final report recommended a $1.3 million <br />well field rehabilitation program. As a follow-on <br />project, Jim managed design and construction <br />assistance of drilling and equipping a 6,5-MGD well, <br />building, and transmission piping for the City. <br />Water Facilities Design* I City of Arcadia I Arcadia, <br />California I Project Manager <br />Jim managed the design and Negative Declaration <br />preparation of the City's Live Oak Water Facilities. <br />Work included drilling and equipping a well capable of <br />pumping up to 4,000 GPM, moveable well house, <br />chlorination facility, 0.3-MG reservoir, 9.5-MGD pump <br />station, 24-inch transmission piping, and site <br />improvements, He also provided construction <br />supervision and assistance. <br />Joint Defense Group I South Tahoe Public Utility <br />District vs. Atlantic Richfield Company, at al* <br />San Francisco, California I Expert Witness <br />San Francisco County Superior Court Case No. <br />999128; Joint Defense Group Retained on behalf of <br />Shell Oil Co.,Shell Oil Products Co, Exxon Corp., <br />Texaco Inc., and Equilon Enterprises LLC, Attorney: <br />McCutchen, Doyle, Brown and Enersen, LLP; Robert <br />Ebe and Craig van Rooyen. Jim provided expert <br />witness services and deposition testimony for a multi- <br />million -dollar landmark litigation assessing the <br />impacts of MTBE-contaminated groundwater to the <br />municipal water system. He evaluated several <br />methods to provide required water supply, in <br />conjunction with reviewing a water supply master plan <br />developed by the opposing expert, His scope of work <br />included developing alternate supply sources, <br />including treatment system evaluation, well supply <br />adequacy assessment, distribution system efficiency <br />assessment, and hydraulic modeling of the water <br />system to substantiate findings and refute the <br />opposing expert's findings. <br />* denotes projects completed with other firms <br />City of Santa Ana On -Call Engineering Design Services for PFAS Treatment Systems RFP NO. 22-133 A-S <br />