Laserfiche WebLink
Nahid Heidarbaghi PE, LEED AP <br />Site Civil <br />21 years of experience Irvine, California <br />Nahid is a detail -oriented engineer with 21 years of professional experience in water and wastewater, <br />transportation, and land development projects. She has extensive experience in water and sewer systems, utility <br />research and coordination, roadway improvements, and land development infrastructure design projects. Her <br />eye for detail and quality control has been instrumental in review of water and sewer plans for Irvine Ranch <br />Water District and other public agencies. <br />EDUCATION Sunset Beach Alley Water Main Replacement' I City <br />of Huntington Beach 1 Huntington Beach, California <br />BS, Civil Engineering, University of Tabriz, Iran Project Engineer <br />REGISTRATIONS <br />Professional Engineer #C67658, California <br />LEED Accredited Professional, US Green <br />Building Council <br />PROJECT EXPERIENCE <br />East Irvine Zone 1 to 3 Flow Meter Replacement* <br />Irvine Ranch Water District (IRWD) I Irvine, California <br />Project Engineer <br />Nahid was project engineer for the replacement of the <br />flow meter that records flows pumped from East Irvine <br />Zone 1 to 3 at the Zone 1 reservoir site. The existing <br />36-inch meter installation was below grade and <br />creating maintenance problems, so a new above <br />ground electromagnetic meter was designed with <br />associated retaining wall and ancillary systems. <br />Irvine Community Development Company I PASS 36- <br />inch Recycled Water Pipeline* I IRWD I Irvine, <br />California I Project Engineer <br />Nahid supplied engineering design and construction <br />management services for a new 36-inch CN1L8C <br />recycled water main. The pipeline is a critical <br />interconnect in the IRWD system and replaced a 27- <br />inch ACP main that was abandoned. She coordinated <br />the pipe design and construction phasing issues with <br />IRWD engineering and construction staff. <br />Water and Wastewater Systems Plan Checking <br />IRWD I Irvine, California <br />Project Engineer <br />Nahid provided on -call plan checking services for <br />submittals received from consultants in various <br />phases of design. The projects included water, <br />recycled water, sewer, and storm runoff facility <br />improvements. <br />Nahid prepared construction plans and specifications <br />for the replacement of 4,400 LF of substandard <br />waterlines in constrained alleys that included water <br />meters and temporary water mains. She also <br />provided design for pavement improvements in the <br />alleys which required pavement grind and overlay. or <br />profile reconstruction to provide positive drainage. <br />The project also included assisting the City in <br />coordination with Caltrans for work encroaching near <br />the Pacific Coast Highway. <br />Domestic Water Pipeline Capital Replacement (CRPs <br />09-18, 09-04, 0911 Hi -Desert Water District <br />Yucca Valley, California I Project Engineer <br />Nahid was involved with three domestic water <br />pipeline replacement projects for the District's CIP, <br />totaling approximately 11,230 linear feet. The <br />improvement plans included new 8-inch PVC water <br />main, replacement of hydrants, laterals and meters. <br />and other appurtenances. <br />City of South Gate I Well No. 27 Treatment System* <br />South Gate, California I Project Engineer <br />Nahid provided engineering design services for the <br />Well No. 27 Treatment System Project in accordance <br />with California Department of Public Health <br />requirements. The Well is a critical supply source in <br />the City`s water system. The project provided <br />adequate removal of Iron (Fe), Manganese (Mn). and <br />Dioxane constituents occurring in the groundwater <br />aquifer. The well produces 1,500 GPM and it is <br />anticipated that all of the flow will need to be treated. <br />The firm evaluated the treatment process and DPH <br />requirements for discharge of the Well's water into the <br />distribution system and identified opportunities for <br />blending with untreated water to reduce the size of <br />the required facilities. The concept plan for the <br />treatment facilities. and the final process design, <br />included Fe/Mn removal; distribution pump: yard <br />piping; and electrical instrumentation and SCADA. <br />* denotes projects completed with other firths <br />City of Santa Ana On Call Engineering Design Services for PEAS Treatment Systems REP NO. 22-133 A-19 <br />