My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC CONSULTING SERVICES, INC. (4)
Clerk
>
Contracts / Agreements
>
S
>
STANTEC CONSULTING SERVICES, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:53:51 AM
Creation date
5/3/2023 3:20:57 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC CONSULTING SERVICES, INC.
Contract #
A-2023-053-02
Agency
Public Works
Council Approval Date
4/4/2023
Expiration Date
4/3/2026
Insurance Exp Date
10/1/2024
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of South Gate I Westside Water and Sewer <br />Forest Lawn Memorial Parks Regional Recycled <br />Main Replacement* I South Gate, California <br />Water Pipeline* I City of Cerritos I Cerritos, California <br />Project Engineer <br />I Project Engineer <br />Nahid performed as project engineer for preliminary <br />Nahid offered engineering design and construction <br />and final engineering design and construction <br />support services for a regional 16-inch recycled water <br />management services that involved the abandonment <br />main to serve the cities of Cerritos, Lakewood, <br />of several City water mains and replacing them with <br />Cypress, and the Cypress Forest Lawn cemetery. <br />new mains (approximately 17,705 LF), The project <br />The pipeline conveys recycled water produced at the <br />also entailed replacing existing sewer mains with <br />LACSD Los Coyotes water reclamation plant to the <br />higher capacity mains (approximately 1,215 LF), as <br />new potential use areas and is funded by the State <br />specified in the City's Sewer Management Plan. <br />DWR Drought relief Program. She assisted with the <br />Well 1A Equipping I Helendale Community Services <br />pipe design and construction phase issues with all <br />cities and stakeholders. <br />District* I Helendale, California I Design Engineer <br />Nahid was design engineer for Well No. 1A, a new <br />1,300-GPM groundwater supply well with a total <br />depth of 630 feet. The well was equipped with a 150- <br />IiP submersible pump including pedestal, piping, and <br />appurtenance design. <br />. denotes projects completed with other firms <br />City of Santa Ana', On -Call Engineering Design Services for PEAS Treatment Systems RPP NO. 22-133 A-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.