My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC CONSULTING SERVICES, INC. (4)
Clerk
>
Contracts / Agreements
>
S
>
STANTEC CONSULTING SERVICES, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:53:51 AM
Creation date
5/3/2023 3:20:57 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC CONSULTING SERVICES, INC.
Contract #
A-2023-053-02
Agency
Public Works
Council Approval Date
4/4/2023
Expiration Date
4/3/2026
Insurance Exp Date
10/1/2024
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RP-1 Mach Restoration & Headworks Second Gate <br />Inland Empire Utilities Agency I Chino, California <br />Structural Lead <br />Simon is involved the mechanical restoration at RP-1 <br />with pipe support design, the secondary gate <br />installation, channel isolation, and structure cover <br />replacement. <br />Basins 2 and 3 Collection System Improvements <br />City of San Mateo I San Mateo, California <br />Structural Engineer <br />Simon has been working this project as one of the <br />key structural engineers. The improvements in the <br />Basins 2 & 3 collection system include: install a new <br />minimum 4.2 MG in -system flow equalization storage <br />facility, including associated pumping and odor <br />control; upgrade/expand three existing pump stations, <br />including expansion of the firm pumping capacity to <br />meet peak wet weather flows, rehabilitation of wet <br />wells, and upgrading of piping and electrical systems; <br />install approximately six miles of new parallel and <br />upsized gravity sewers and force mains, ranging in <br />size from 8 inches to 48 inches, and provide <br />rehabilitation of some force mains. <br />Seal Beach Pumping Upgrade and 3-62: Westminster <br />Boulevard Force Main Replacement Design I Orange <br />County Sanitation District I Seal Beach, California <br />Lead Structural Engineer <br />Simon worked on this project as lead structural <br />engineer. This project included the rehabilitation of <br />the Seal Beach pump station and Westminster <br />Boulevard force main replacement. <br />VSD Structural Assessment of Activated Sludge <br />Selectors and Aeration Basins I Valley Sanitary <br />District I Indio, California I Lead Structural Engineer <br />Simon has been working on this project as a lead <br />structural engineer. This project includes structural <br />assessment of the existing Activated Sludge <br />Selectors and Aeration Basins. A condition <br />assessment using visual observations and non- <br />destructive testing was performed for the existing <br />concrete basins (selectors, aeration basins), safety <br />railing, and concrete bridge above aeration tanks. The <br />final technical memorandum summarizes the findings <br />and recommendations, as well as an AACE concept <br />level cost estimate for the recommended repair <br />approach. <br />Hyperion Treatment Plant Digester Gas Utilization <br />Project I City of Los Angeles I Playa Del Rey, <br />California I Structural Engineer <br />Simon is serving as structural engineer for this <br />digester gas utilization project. <br />Seismic Retrofit City of Simi Valley Water Quality <br />Control Plant* I City of Simi Valley I Simi Valley, <br />California I Principal Structural Engineer <br />Simon was responsible for this seismic retrofit design <br />of six, 1970s-era buildings located at the Water <br />Quality Control Plant. Each structure required seismic <br />upgrades to provide adequate masonry wall <br />anchorage to the flexible wood roof diaphragm and to <br />provide a complete load path to distribute wall forces <br />into the roof diaphragms. Coordination of demolition, <br />architectural ceiling repairs, and other nonstructural <br />components were provided to help the City prepare a <br />general contractor RFP for the proposed upgrades, <br />Structural Evaluation of Santa Barbara El Estero <br />Wastewater Treatment Plant* I Santa Barbara, <br />California I Principal Structural Engineer <br />Simon worked as the project manager to address <br />structural and corrosion engineering assessment and <br />evaluation of the existing 1970s-era concrete process <br />structures, support, and maintenance buildings as <br />part of an overall asset management plan (19 <br />concrete structures in total). The assessment <br />included concrete condition, seismic evaluation, <br />corrosion considerations, expected serviceability and <br />performance, and recommendations for repairs and <br />upgrades. A detailed report prioritized repairs and <br />made recommendations for future improvements as <br />part of an overall capital improvement plan, The <br />report aids the City to allocate funds for future <br />improvements and maintenance. <br />South Bay International Wastewater Treatment Plant <br />New Administration Building* 1 South Bay <br />International I San Diego, California I Project <br />Structural Engineer <br />Simon provided civil, structural, mechanical, <br />electrical, and fire protection engineering services for <br />the design -build construction of a new administration <br />building for the plant. The structural design included <br />the Unified Facilities Criteria --Department of Defense <br />Minimum Antiterrorism Standards for Buildings. The <br />project was finished within budget and on schedule. <br />Casitas Water System Condition Assessment of <br />Water Facilities I Casitas Municipal Water District <br />Oak View, California I Structural Lead <br />Simon was involved in the as -built condition <br />assessment of 16 reservoir tanks and pump station <br />sites. He oversaw the structural assessment of <br />existing tanks and structural elements, as well as <br />providing the retrofit schemes for any deficient <br />elements to maintain operation for another 10 years <br />Ojai Wastewater Treatment Plant Nutrient TMDL <br />Project—Dentification Filters I Ojai Valley Sanitary <br />District I Ventura, California I Structural Engineering <br />Lead/Structural Engineer of Record <br />Simon is leading structural engineering from the initial <br />project stage through to the 100% design submittal. <br />This project consists of adding one new denitrifcation <br />filter structure and new chemical tank area, and the <br />modifications of one existing flocculation basin, four <br />existing denitrification filter structures, and two <br />existing oxidation ditches. One new electrical room is <br />being added to the chemical building to expand <br />electrical equipment. <br />"denotes projects completed with other firms <br />Clty of Santa Ana', On -Call Engineering Design Services for PFAS Treatment Systems RFP NO. 22-133 A-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.