Bruce Wong PE, PMP, ENV SP
<br />Electrical
<br />19 years of experience • Pasadena, California
<br />Bruce brings 19 years of experience in design of power and control systems for numerous process
<br />configurations, including water/wastewater treatment plants. His design expertise includes chemical
<br />delivery/containments systems, low-, medium-, and high -voltage power generation/distribution, hydropower
<br />generation, high -voltage substation design, and indoor/outdoor lighting design. Recently, Bruce assisted in the
<br />detailed design of two processes for a 16-MGD water recycling plant in the pacific northwest. In Southern
<br />California, Bruce has most recently worked with the City of South Pasadena and the Metropolitan Water District
<br />of Southern California.
<br />EDUCATION
<br />MBA, Cal Poly Pomona, California
<br />MS, Engineering Management, Cal Poly Pomona,
<br />California
<br />MS, Electrical Engineering, Cal Poly Pomona,
<br />California
<br />BS, Electrical Engineering, University of Los Angeles,
<br />California
<br />REGISTRATIONS
<br />Professional Engineer #E1 8415, California
<br />Project Management Professional (PMP)@) #PMP
<br />1494856, Project Management Institute
<br />PROJECT EXPERIENCE
<br />City of Santa Ana Well 40 1 OCWD I Santa Ana,
<br />California I Electrical Engineer
<br />Bruce worked as the electrical engineer adding the
<br />Automatic Transfer Switch (ATS), emergency standby
<br />generator, and soft starter for the booster pump. The
<br />project consists of adding electrical equipment
<br />(automatic transfer switch, sizing the emergency
<br />standby generator, and soft starter) and
<br />instrumentation equipment. He was responsible for
<br />coordinating with a subconsultant to update as-builts
<br />of the electrical drawings. Bruce assisted in reviewing
<br />shop drawingsand answering RFls. The project is
<br />currently in the construction phase.
<br />City of Santa Ana Well 38 1 OCWD I Santa Ana,
<br />California I Electrical Engineer
<br />Bruce worked as the electrical engineer for re -design
<br />of the electrical distribution system. It included
<br />replacing the switchboard, motor control center,
<br />VFDs, and adding onsite hypochlorite generation
<br />system and soft starter for booster pump. The project
<br />consisted of developing the electrical site plan, one
<br />line diagram, grounding plan, conduit & cable
<br />schedule, duct bank design, and control diagram. The
<br />project is currently in the design phase.
<br />Treatment Plant No. 2, Headworks Modification
<br />Project I Orange County Sanitation District I Fountain
<br />Valley, California I Lead Electrical Engineer
<br />Bruce designed the power distribution system for the
<br />additional separation gate and sump pump system.
<br />He assisted in the development of single line
<br />diagrams, confirming cable/conductor sizes, creating
<br />a cable/conduit schedule. reviewing shop drawings,
<br />and answering RFIs. The project is currently in the
<br />construction phase.
<br />Plant No. 1 and 2 Consolidated Demo and Utility
<br />Improvements I Orange County Sanitation District
<br />Orange County, California I Electrical Engineer
<br />Bruce assisted with the design of the lighting plan and
<br />lighting schedule for this project. In addition, Bruce
<br />performed the final back check on the electrical and
<br />I&C drawings. Bruce reviewed the submittals and
<br />shop drawings and answered RFIs.
<br />3-62: Westminster Boulevard Force Main
<br />Replacement Design I Orange County Sanitation
<br />District I Orange County, California I Lead
<br />Electrical Engineer
<br />Bruce served as the lead electrical engineer for the
<br />preliminary design of the rehabilitation of seal beach
<br />station. He designed the electrical room and
<br />generator room. Bruce sized the generator and fuel
<br />tank. He performed the design using AutoCAD and
<br />generated several electrical drawings including single
<br />line diagram, electrical room layout, and generator
<br />room layout.
<br />Long Beach Municipal Urban Stormwater Treatment
<br />City of Long Beach I Long Beach, California I Lead
<br />Electrical Engineer/Electrical Engineer of Record
<br />Bruce is the lead electrical engineer for the new
<br />Stormwater Treatment Plant. He helped develop
<br />single line diagrams, the electrical site, control
<br />diagram,. confirmed cable/conductor sizes, reviewed
<br />shop drawings, and answered RFIs. The project is
<br />currently in the construction phase.
<br />City of Santa Ana On -Call Engineering Design Services for PEAS Treatment Systems REP NO. 22-133 A-25