Laserfiche WebLink
Grand Avenue Well Equipping I Three Valleys <br />Municipal Water District I Claremont, California <br />Electrical Engineer <br />Bruce worked as the electrical engineer adding the <br />Manual Transfer Switch and POSILOCK connection <br />box for the portable generator. The project consisted <br />of adding electrical equipment (manual transfer <br />switch, PSILOCK connection box, and sizing the <br />portable suitable generator) and instrumentation <br />equipment. He was responsible for coordinating with <br />a subconsultant to update as-builts of the electrical <br />drawings. Bruce assisted in reviewing shop drawings <br />and answering RFIs. The project is currently in the <br />construction phase. <br />Southern California Edison Transmission and <br />Distribution Substations I Southern California Edison <br />Pomona, California I Cost Estimator <br />Bruce worked at SCE Pomona Campus interpreting <br />transmission & distribution substation project plans <br />and drawings and translating completed estimates <br />into reports. He also prepared interest expense and <br />depreciation calculations, and other internal output <br />reports based on existing estimates to close out <br />projects. <br />Bogert Trail Sewer Lift Station I City of Palm Springs <br />Palm Springs, California I Lead Electrical Engineer <br />Bruce designed the distribution power system for the <br />lift station. The project consisted of designing the <br />main service pedestal with utility meter and main <br />breakers and power panel, surge protective device, <br />and step down transformer. A panelboard schedule, <br />light fixture schedule, and conduit schedule were <br />created. The design was completed in 2019. <br />Water Treatment Plant Mods ISC Kodiak I US Coast <br />Guard I Kodiak, Alaska I Lead Electrical Engineer <br />As the lead electrical engineer on this project, Bruce <br />performed electrical design on the Soda Ash System. <br />In addition, he re -designed the power distribution <br />system for the 559 pumphouse and N23 treatment <br />plant, <br />16 MGD Industrial Water Recycling Facility I Client <br />Confidential I Portland, Oregon I Assistant Project <br />Engineer <br />Bruce assisted the on -site lead electrical engineer <br />with the electrical design of the two processes for an <br />industrial water recycling facility. The project was <br />delivered through a design -build procurement method <br />and Bruce helped develop single line diagrams, <br />confirm cable/conductor sizes, review shop drawings, <br />and answer RFIs. <br />Eielson Air Force Base Water Treatment Plant I Air <br />Force Civil Engineering Center I Eielson, Alaska <br />Electrical Engineer <br />As electrical engineer, Bruce designed the electrical <br />system for expansion of water treatment plant. The <br />electrical site plan, single line diagram, control <br />schematic, panelboard schedule, and equipment <br />elevation were created using Micro station. <br />City of Santa Ana' On -Call Engineering Design Services for PEAS Treatment Systems RFP NO. 22-133 A-26 <br />