James Loucks PMP,CCP
<br />Cost Estimating
<br />44 years of experience Walnut Creek, California
<br />James (Jim) has 44 years of experience in the construction services and engineering consulting industries, Jim
<br />focuses on pre -construction planning and construction phase support for a wide range of water infrastructure
<br />projects. His expertise includes constructability, cost estimating, scheduling, claims and risk management of
<br />hydraulic structures, sanitary sewer collection systems, water conveyance facilities, sanitary lift stations, and
<br />water pumping facilities. He has provided master planning inputs of linear infrastructure for projects focused on
<br />water systems, hydraulic modeling for pressure and gravity flow systems, transient surge mitigation measures
<br />for pumping facilities, and pump and lift station engineering services to several water districts, public utilities, and
<br />municipalities throughout Southern California.
<br />EDUCATION
<br />BS, Construction Engineering, Arizona State
<br />University, Tempe, Arizona
<br />REGISTRATIONS
<br />Project Management Professional (PMP)® #534386,
<br />Project Management Institute
<br />Certified Cost Professional #2361, Association for the
<br />Advancement of Cost Engineering International
<br />PROJECT EXPERIENCE
<br />San Francisco Public Utilities Commission I CS-777B,
<br />As -Needed Engineering Design Services
<br />San Francisco, California I Lead Estimator
<br />Jim led estimating efforts and worked with a multi-
<br />disciplinary team that provided civil, structural,
<br />geotechnical, mechanical, electrical, and special
<br />engineering services for the upgrade, expansion, and
<br />seismic retrofit on a wide range of wastewater, water,
<br />and power facilities, including dams, reservoirs,
<br />tunnels, treatment plants, pipelines, pump stations,
<br />and power transmission facilities. The scope of
<br />services included preparing design and specifications
<br />documents, technical reviews, cost estimating, and
<br />value engineering on the Water System Improvement
<br />Program (WSIP) and non-WSIP projects. Jim
<br />provided 10 to 15 cost estimates under the contract,
<br />including one for the Harry Tracy Water Treatment
<br />Plant Short -Term Improvements, Phase 3 project.
<br />Fdant-Kern Canal Middle Reach Capacity and
<br />Subsidence Correction Project I Friant Water
<br />Authority & U.S. Bureau of Reclamation I California
<br />Cost Estimator
<br />Jim serves as principal estimator for the 30% design
<br />stage cost estimate and seven project alternatives.
<br />The team is providing engineering, environmental,
<br />and construction management services to complete
<br />alternatives analyses and preliminary design to
<br />restore capacity to a 33-mile canal segment that
<br />includes 20 miles of new canal, 100 farmer turnouts.
<br />and 50 right-of-way acquisition parcels.
<br />3-62: Westminster Boulevard Force Main
<br />Replacement I Orange County Sanitation District 1
<br />Seal Beach, California I Estimator
<br />The project involved the construction of new
<br />single and dual 36" HDPE force mains along
<br />Westminster Boulevard,
<br />San Luis Water District I Villages of San Luis Water
<br />Infrastructure Program* I San Luis Water District
<br />San Luis, California I Principal Estimator
<br />Jim provided cost estimating for a $230 million
<br />program involving a raw water diversion off the CAP
<br />with common site development of wastewater and
<br />water treatment facilities. Conveyance piping was
<br />also included to cover recycled water delivery
<br />and storage.
<br />US Bureau of Reclamation I Sacramento River Water
<br />Reliability Study* I Mid Pacific Region/Department of
<br />the Interior I California I Principal Estimator
<br />Jim oversaw cost estimating for the $775 million
<br />program involving river intake and water conveyance
<br />pipeline upgrades for four major water districts in
<br />northeast Sacramento, covering a multi -year
<br />build -out program.
<br />Sacramento County Regional Water District
<br />Sacramento River Water Reliability Study I California
<br />Principal Estimator
<br />Jim served as principal estimator for the $775 million
<br />program that involved river intake and water
<br />conveyance pipeline upgrades for four major water
<br />districts in northeast Sacramento, covering a
<br />multi -year build out program.
<br />Vineyard Surface Water Treatment Plant
<br />Sacramento County Water Agency
<br />Sacramento County, California I Cost Estimator
<br />Jim developed the 30, 60, and 90 percent design
<br />stage cost estimates for the $75 million
<br />Greenfelds plant.
<br />denotes projects completed with other firms