Laserfiche WebLink
James Loucks PMP,CCP <br />Cost Estimating <br />44 years of experience Walnut Creek, California <br />James (Jim) has 44 years of experience in the construction services and engineering consulting industries, Jim <br />focuses on pre -construction planning and construction phase support for a wide range of water infrastructure <br />projects. His expertise includes constructability, cost estimating, scheduling, claims and risk management of <br />hydraulic structures, sanitary sewer collection systems, water conveyance facilities, sanitary lift stations, and <br />water pumping facilities. He has provided master planning inputs of linear infrastructure for projects focused on <br />water systems, hydraulic modeling for pressure and gravity flow systems, transient surge mitigation measures <br />for pumping facilities, and pump and lift station engineering services to several water districts, public utilities, and <br />municipalities throughout Southern California. <br />EDUCATION <br />BS, Construction Engineering, Arizona State <br />University, Tempe, Arizona <br />REGISTRATIONS <br />Project Management Professional (PMP)® #534386, <br />Project Management Institute <br />Certified Cost Professional #2361, Association for the <br />Advancement of Cost Engineering International <br />PROJECT EXPERIENCE <br />San Francisco Public Utilities Commission I CS-777B, <br />As -Needed Engineering Design Services <br />San Francisco, California I Lead Estimator <br />Jim led estimating efforts and worked with a multi- <br />disciplinary team that provided civil, structural, <br />geotechnical, mechanical, electrical, and special <br />engineering services for the upgrade, expansion, and <br />seismic retrofit on a wide range of wastewater, water, <br />and power facilities, including dams, reservoirs, <br />tunnels, treatment plants, pipelines, pump stations, <br />and power transmission facilities. The scope of <br />services included preparing design and specifications <br />documents, technical reviews, cost estimating, and <br />value engineering on the Water System Improvement <br />Program (WSIP) and non-WSIP projects. Jim <br />provided 10 to 15 cost estimates under the contract, <br />including one for the Harry Tracy Water Treatment <br />Plant Short -Term Improvements, Phase 3 project. <br />Fdant-Kern Canal Middle Reach Capacity and <br />Subsidence Correction Project I Friant Water <br />Authority & U.S. Bureau of Reclamation I California <br />Cost Estimator <br />Jim serves as principal estimator for the 30% design <br />stage cost estimate and seven project alternatives. <br />The team is providing engineering, environmental, <br />and construction management services to complete <br />alternatives analyses and preliminary design to <br />restore capacity to a 33-mile canal segment that <br />includes 20 miles of new canal, 100 farmer turnouts. <br />and 50 right-of-way acquisition parcels. <br />3-62: Westminster Boulevard Force Main <br />Replacement I Orange County Sanitation District 1 <br />Seal Beach, California I Estimator <br />The project involved the construction of new <br />single and dual 36" HDPE force mains along <br />Westminster Boulevard, <br />San Luis Water District I Villages of San Luis Water <br />Infrastructure Program* I San Luis Water District <br />San Luis, California I Principal Estimator <br />Jim provided cost estimating for a $230 million <br />program involving a raw water diversion off the CAP <br />with common site development of wastewater and <br />water treatment facilities. Conveyance piping was <br />also included to cover recycled water delivery <br />and storage. <br />US Bureau of Reclamation I Sacramento River Water <br />Reliability Study* I Mid Pacific Region/Department of <br />the Interior I California I Principal Estimator <br />Jim oversaw cost estimating for the $775 million <br />program involving river intake and water conveyance <br />pipeline upgrades for four major water districts in <br />northeast Sacramento, covering a multi -year <br />build -out program. <br />Sacramento County Regional Water District <br />Sacramento River Water Reliability Study I California <br />Principal Estimator <br />Jim served as principal estimator for the $775 million <br />program that involved river intake and water <br />conveyance pipeline upgrades for four major water <br />districts in northeast Sacramento, covering a <br />multi -year build out program. <br />Vineyard Surface Water Treatment Plant <br />Sacramento County Water Agency <br />Sacramento County, California I Cost Estimator <br />Jim developed the 30, 60, and 90 percent design <br />stage cost estimates for the $75 million <br />Greenfelds plant. <br />denotes projects completed with other firms <br />City of Santa Ana 0n-Ca 11 Engineering Design Services for PFAS Treatment Systems RFP N0. 22-133 A-29 <br />