My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC CONSULTING SERVICES, INC. (4)
Clerk
>
Contracts / Agreements
>
S
>
STANTEC CONSULTING SERVICES, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:53:51 AM
Creation date
5/3/2023 3:20:57 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC CONSULTING SERVICES, INC.
Contract #
A-2023-053-02
Agency
Public Works
Council Approval Date
4/4/2023
Expiration Date
4/3/2026
Insurance Exp Date
10/1/2024
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Treatment Facility, Albany I Minnesota <br />Project Engineer <br />Ryan was responsible for process design of the <br />Albany Water Treatment facility that is designed to <br />remove arsenic, iron, and manganese at a peak flow <br />rate of 2,0 MGD. There is a 200,000- gallon clearwell <br />for water storage built into this treatment plant, <br />Currently, there are two 1,000 GPM pumps that serve <br />the High Zone, and one 1,000 GPM pump to serve <br />the Low Zone, This plant is expandable to a 4.0 MG <br />capacity in the future when necessary. <br />Water Treatment Plant, Harris I Minnesota <br />Project Manager <br />Ryan was responsible for process design and <br />coordination of a 0.5 MGD radium, iron, and <br />manganese treatment facility that includes a forced <br />draft aerator, one steel gravity -type filter vessel with <br />detention tank, a backwash retention tank, and high <br />service pumping capacity of 300 GPM. <br />Water Treatment Facility, Maple Plain I Minnesota <br />Project Manager/Lead Process Design Engineer <br />Ryan was responsible for the design of a 1.0 MGD <br />facility to reduce radium, iron, and manganese from <br />the groundwater supply. The project included <br />modifications to the existing water supply well and <br />distribution piping. <br />Water Treatment Plant Improvements <br />Benson, Minnesota I Project Manager/ <br />Process Design Engineer <br />Ryan led a multi -discipline design team in developing <br />this improvements project, including removal and <br />renovation of an existing gravity treatment plant and <br />the addition of a backwash reclamation system. Ryan <br />worked with the Owner and the Public Facilities <br />Authority to secure funding for this project, which <br />included Green Project Reserve Funding for the <br />backwash reclamation aspect of the project, Ryan will <br />continue to serve as project manager through <br />construction completion and commissioning. <br />Stacy Water Treatment Plant I City of Stacy <br />Stacy, Minnesota I Project Manger <br />Ryan served the City as the project manager for a <br />state of the art water treatment facility designed to <br />reduce radium to drinking water standards. Ryan <br />guided the City through the funding process and was <br />able to secure the maximum grant to loan value <br />through the USDA —Rural Development funding <br />program for the City. The project included <br />construction of a new well, demolition of an existing <br />water tower, construction of the new Water Treatment <br />Plant and modifications to the City Hall to attain ADA <br />accessibility and compliance. The project was <br />substantially completed and passed tests for Radium <br />226/228 with no detection. <br />City of Santa Ana', On -Call Engineering Design Services for PEAS Treatment Systems RFP NO.22-133 A32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.