My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC CONSULTING SERVICES, INC. (4)
Clerk
>
Contracts / Agreements
>
S
>
STANTEC CONSULTING SERVICES, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:53:51 AM
Creation date
5/3/2023 3:20:57 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC CONSULTING SERVICES, INC.
Contract #
A-2023-053-02
Agency
Public Works
Council Approval Date
4/4/2023
Expiration Date
4/3/2026
Insurance Exp Date
10/1/2024
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ryan Capl PE <br />Treatment/Process Mechanical <br />,r 25 years of experience - Minneapolis, Minnesota <br />> r _ 1i <br />In his 25 years of providing engineering service, Ryan has developed the ability to effectively manage a <br />multi -discipline team through design, planning, and implementation of municipal, water treatment, and water <br />supply projects. He has provided service on more than 50 water treatment facilities and other water <br />infrastructure projects. For several years, Ryan has focused his expertise in per- and polyfluorinated substances <br />(PFAS). Ryan's work includes the design, management, and implementation of full-scale PFAS treatment <br />facilities, pilot -scale test facilities and emergency response programs. Ryan collaborates with Stantec's <br />Research Team and with private organizations to prepare and conduct pilot -scale analyses including <br />procurement of experimental plans, data analysis, and economic evaluations of treatment <br />processes/technologies that reduce PFAS and other contaminants in drinking water. Ryan's unique range of <br />project management, design and construction experience has enhanced his ability to organize and deliver <br />projects that result in safe, reliable, compliant water for communities. <br />EDUCATION <br />MS, Infrastructure Systems Engineering, University of <br />Minnesota, Minneapolis, Minnesota <br />BS, Civil Engineering, University of Minnesota, <br />Minneapolis, Minnesota <br />REGISTRATIONS <br />Professional Engineer#43142, Minnesota <br />Professional Engineer#41310-6, Wisconsin <br />Professional Engineer #PE-1 0171, North Dakota <br />PROJECT EXPERIENCE <br />PFAS Pilot Study I Cottage Grove, Minnesota <br />Project Manager <br />Stantec, in conjunction with Johns Hopkins University <br />is currently conducting a pilot study for the Minnesota <br />Pollution Control Agency to achieve three objectives, <br />1 ) Assess efficacy of anion exchange (AIX) resins for <br />treatment of PFAS; 2) assist Minnesota Department <br />of Heath with developing a policy for new <br />technologies for treating PFAS, and 3) Provide <br />economic comparisons between AIX and granular <br />activated carbon (GAC). Stantec's local staff works <br />directly with staff at Johns Hopkins University on a <br />weekly basis to collect, analyze, and report <br />concentrations of 32 PFAS analytes. In only four <br />business days, the team provided water sample <br />results. The Stantec/University Alliance differentiator <br />leverages some of the brightest minds in the industry <br />to provide technical leadership on the subject of <br />PFAS. The alliance sound foundation of teamwork <br />afforded our team the ability to provide state of the <br />art. long-term solutions for PFAS. <br />Interim Water Treatment Facilities I City of Cottage <br />Grove I Cottage Grove, Minnesota I Project Manager <br />The Minnesota Department of Health notified the City <br />that eight of its 11 wells were over the newly <br />established health index values for PFAS. The <br />response required the full attention of Stantec's multi- <br />discipline team led by Ryan, working in unison with <br />members from various departments of the City to <br />deliver the project under emergency design/build <br />conditions. The project successfully delivered safe, <br />compliant drinking water for residents within 84 days <br />and was awarded the American Public Works <br />Association Project of the Year Award in 2017. <br />Water Treatment Facility I City of Granite Falls <br />Granite Falls, Minnesota j Project Manager <br />During the design for this 0.84 MGD lime softening <br />water treatment facility project. Ryan collaborated <br />with City staff to incorporate their desired process and <br />hydraulic design elements. Ryan worked with the City <br />staff to deliver the construction phase of this project. <br />SW Water Treatment Plant I Sartell, Minnesota <br />Project Engineer <br />Ryan was responsible for process design of a new 6 <br />MGD conventional gravity filter plant for Iron and <br />manganese removal. The plant was designed to be <br />easily expanded to 16 MGD. <br />Water Treatment Plant Expansion I City of Inver <br />Grove Heights I Inver Grove Heights, Minnesota <br />Project Manager <br />The City of Inver Grove Heights chose Stantec to <br />design and provide construction assistance of their <br />6,02 MGD manganese removal water treatment <br />facility. The expansion adds two backwash tanks, four <br />filter cells and laboratory, as well as additional <br />accommodations for staff needs. Ryan was project <br />manager, provided process design, construction <br />management, and contract administration. <br />City of Santa Ana On Ca II Engineering Design Services for PFAS Treatment Systems RFP NO. 22-133 A-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.