My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (8)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 3:48:46 PM
Creation date
5/3/2023 3:21:29 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2023-053-01
Agency
Public Works
Council Approval Date
4/4/2023
Expiration Date
4/3/2026
Insurance Exp Date
10/1/2025
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NTETRA TECH <br />November 17. 2022 <br />Armando Fernandez, PE <br />Project Manager <br />City of Santa Ana, Public Works Agency <br />220 S. Daisy Ave., M-85 <br />Santa Ana, CA 92703 <br />Reference: Request for Proposals for On -Call Engineering Design Services for PFAS <br />Treatment Systems, RFP No. 22-133 <br />Dear Mr. Fernandez, <br />Tetra Tech is very pleased to provide our proposal for your <br />On -Call Engineering Design Services for PFAS Treatment <br />Systems. In the last four years Tetra Tech has been performing <br />similar PFAS engineering services for public agencies in both <br />Orange and Los Angeles Counties. We are one of only a few <br />firms that have completed the design of six PFAS projects, <br />including the first operating project in Orange County and <br />the largest PFAS Ion Exchange (IX) project in the United <br />States. <br />The Team we are proposing has extensive, local experience <br />developed over the last five years on PFAS projects. <br />Steve Tedesco, PE, our Project Manager has directed each of <br />these projects making sure the Team provides high -quality <br />engineering while meeting project budgets and schedule. Over <br />the last four years our team has developed a large data base of <br />costs on completed projects that can be used to provide cost <br />certainty in this time of rapidly changing prices. <br />To accelerate the schedule and reduce costs, Tetra Tech has <br />developed an implementation strategy that will provide the City <br />of Santa Ana (City) with two separate design teams working <br />under the direction of a single Project Manager and reviewed <br />by a single QA/QC Manager for consistency. Each team <br />includes a Task Leader and key design team members in the <br />following engineering disciplines: <br />■ Civil <br />■ Process/Mechanical <br />■ Structural <br />■ Electrical, Instrumentation & Control <br />■ Water Quality <br />■ 3D CADD <br />Each team will also have access to an additional 20 engineers and production staff to use as needed to <br />further accelerate the schedule. Tetra Tech is committing 35 full-time staff with over 90% of them <br />located in Southern California. Our only sub -consultants on the project consist of Leighton Associates <br />for Geotechnical Engineering and Metz Surveying for Site Topographic Survey. We have also included <br />Alan Ludwig of Pascal & Ludwig to assist with cost estimating and constructability review. Having a <br />local contractor who has built numerous IX plants brings additional credibility to a project. <br />17885 VDP Krmin A.-nua. Suite 500. Irvine. CA 9?61 #-52J <br />Tel 979.809.5000 Fax 979.809.5010 tetratech.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.