My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (8)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 3:48:46 PM
Creation date
5/3/2023 3:21:29 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2023-053-01
Agency
Public Works
Council Approval Date
4/4/2023
Expiration Date
4/3/2026
Insurance Exp Date
10/1/2025
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Armando Fernandez. PE <br />November 17. 2022 <br />Page 2 <br />Our detailed understanding and scope of services was developed by our Team based on our <br />successfully completed PFAS studies and design projects. In our approach to the study phase of the <br />project we propose to review each well site and determine if it should be considered for a single well <br />site design or be combined into a centralized system. We will determine if the existing well pump and <br />motor is large enough to pump through the proposed PFAS plant and piping system. On centralized <br />systems we will prepare a hydraulic model to determine the required pump and motor sizing to <br />determine if the system is the most cost effect option. Our scope of services includes the required <br />coordination, reports and design needed to obtain a California Division of Drinking Water (DDW) permit. <br />The Tetra Tech team assigned to this project brings the following important advantages to this contract: <br />■ We have studied and designed PFAS Plants on single well sites and Centralized Treatment <br />Facilities to serve multiple wells on a single site. Our team knows how to model, size and design <br />well field connecting piping on busy urban streets. <br />■ We bring extensive local experience including four completed studies and six completed PFAS <br />system designs. Our Headquarters Project for Yorba Linda Water District is the largest PFAS IX <br />plant in the United States and the winner of both the ASCE Orange County Branch and ASCE <br />Los Angeles Region Project of the Year. <br />■ We have obtained permits for similar PFAS projects from the DDW, other State and local agencies. <br />We have obtained three permits from the Santa Ana DDW office for IX PFAS treatment plants. <br />■ Our team will use 3D modeling in all our design efforts to allow the City staff to visualize what your <br />completed project will look like as we progress with the design. <br />We have reviewed the City's Sample Standard Agreement attached to the Request for Proposal and <br />concur with the provisions contained in the Agreement. Additionally, this proposal shall remain valid for <br />a period of not less than 120 days from the date of submittal. <br />Tetra Tech and members of our team for this project have worked together with the City on <br />water projects for over 30 years. Let us assure you that our entire team understands the importance <br />of this project. As Tetra Tech's client manager, I promise to ensure that our work will not only be timely <br />but also of the highest -quality that the City expects and deserves. If you have any questions, please <br />feel free to contact Steve Tedesco, our sole source of contact at (949) 632-2169. <br />Sinc Iy, <br />Tom Ep son, PE <br />Vice President <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.