ardy & Harper., Inc.
<br />32 RANCHO CIRCLE
<br />LAKE FOREST, CA 92630
<br />(714) 444-1851 FAX C7143 444-2801
<br />STATE LIC. NO. 215952
<br />DIR NO. 1000000076
<br />To:
<br />CITY OF SANTA ANA
<br />Contact: Salvador Jordan Munoz
<br />Address:
<br />220 S. DAISY AVE. BLDG A
<br />Phone: (714) 647-5468
<br />SANTA ANA, CA 92703
<br />Fax:
<br />Project Name:
<br />Santa Ana - Emergency On Call Contract 2-6-23
<br />Bid Number:
<br />Project Location:
<br />Bid Date:
<br />Item #
<br />Item Description
<br />Estimated Quantity Unit
<br />Unit Price
<br />Total Price
<br />1
<br />1
<br />Sample Task A UNCLASSIFIED EXCAVATION
<br />550.00 CY
<br />$262.00
<br />$144,100.00
<br />2
<br />AC PAVEMENT
<br />130.00 TON
<br />$375.00
<br />$48,750.00
<br />3
<br />FURNISH & INSTALL #6 PULLBOX
<br />4.00 EACH
<br />$1,500.00
<br />$6,000.00
<br />4
<br />ADJUST MANHOLE TO FINISHED GRADE
<br />5.00 EACH
<br />$2,750.00
<br />$13,750.00
<br />5
<br />PCC CURB & GUTTER (TYPE A-2-8)
<br />100.00 LF
<br />$190.00
<br />$19,000.00
<br />6
<br />SIGNING & STRIPING
<br />1.00 LS
<br />$26,250.00
<br />$26,250.00
<br />7
<br />TRAFFIC CONTROL WORK
<br />1.00 LS
<br />$43,750.00
<br />$43,750.00
<br />Total Price for above 1 Items:
<br />$301,600.00
<br />2
<br />1
<br />Sample Task B UNCLASSIFIED EXCAVATION
<br />2
<br />PCC SIDEWALK
<br />3
<br />PCC CURB RAMP
<br />4
<br />PCC CURB & GUTTER (TYPE A-2-8)
<br />5
<br />FURNISH & INSTALL #6 PULLBOX
<br />6
<br />ADJUST MANHOLE TO FINISHED GRADE
<br />7
<br />CATCH BASIN
<br />8
<br />REMOVE & REPLACE 30" REINFORCED CONCRETE PIPE
<br />9
<br />GUARD RAIL REPLACEMENT
<br />10
<br />GUARD RAIL REPLACEMENT TERMINATION
<br />11
<br />REMOVE & REPLACE CHAIN LINK R/W FENCE
<br />12
<br />CONCRETE BARRIER TYPE 836
<br />13
<br />TRAFFIC CONTROL WORK
<br />550.00 CY
<br />$262.00
<br />$144,100.00
<br />2,500.00 SF
<br />$27.00
<br />$67,500.00
<br />3,000.00 SF
<br />$34.00
<br />$102,000.00
<br />100.00 LF
<br />$188.00
<br />$18,800.00
<br />4.00 EACH
<br />$1,500.00
<br />$6,000.00
<br />5.00 EACH
<br />$2,750.00
<br />$13,750.00
<br />1.00 EACH
<br />$41,250.00
<br />$41,250.00
<br />75.00 LF
<br />$1,250.00
<br />$93,750.00
<br />50.00 LF
<br />$240.00
<br />$12,000.00
<br />1.00 EACH
<br />$9,750.00
<br />$9,750.00
<br />50.00 LF
<br />$165.00
<br />$8,250.00
<br />50.00 LF
<br />$1,250.00
<br />$62,500.00
<br />1.00 LS
<br />$65,000.00
<br />$65,000.00
<br />Total Price for above 2 Items:
<br />$644,650.00
<br />Total Bid Price: $946,250.00
<br />Notes:
<br />• IN NO EVENT SHALL HARDY & HARPER, INC. BE RESPONSIBLE OR LIABLE FOR ANY FAILURE OR DELAY IN THE PERFORMANCE OF ITS
<br />OBLIGATIONS HEREUNDER ARISING OUT OF OR CAUSED BY, DIRECTLY OR INDIRECTLY, FORCES BEYOND ITS CONTROL, INCLUDING,
<br />WITHOUT LIMITATION, STRIKES, WORK STOPPAGES, ACCIDENTS, ACTS OF WAR OR TERRORISM, CIVIL OR MILITARY DISTURBANCES,
<br />NUCLEAR OR NATURAL CATASTROPHES, PANDEMICS OR ACTS OF GOD, AND INTERRUPTIONS, LOSS OR MALFUNCTIONS OF UTILITIES,
<br />COMMUNICATIONS OR COMPUTER (SOFTWARE AND HARDWARE) SERVICES, UNFORESEEN COST ESCALATION. HARDY & HARPER, INC. SHALL
<br />USE REASONABLE EFFORTS CONSISTENT WITH ACCEPTED PRACTICES IN THE INDUSTRY TO RESUME PERFORMANCE AS SOON AS
<br />PRACTICABLE.
<br />• INCLOSIONS:
<br />• LABOR, EQUIPMENT & MATERIAL
<br />• PRICE INCLUDES ONE (1) MOVE -IN - $10,500.00 FOR EACH ADDITIONAL MOVE -IN
<br />• PRICE BASED ON MINIMUM 8 HR SHIFTS
<br />• PROPOSAL PRICES GOOD FOR 30 DAYS WITH SIGNED QUOTE OR LOI - PRICE GOOD THROUGH 3/30/2023 - PRICES SUBJECT TO INCREASE
<br />AFTER EXPIRATION DATE
<br />• CUT, LOAD, HAUL, SWEEP &TACK
<br />Page 1 of 2
<br />
|