Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO.: 22-096 <br />ON CALL EMERGENCY ASPHALT & PCC <br />SCOPE OF WORK <br />Introduction and Backeround: <br />The City of Santa Ana (City) desires to enter into an agreement with a qualified construction company for <br />the repair of roadway asphalt concrete and concrete, and/or other infrastructure within the public right of that <br />may experience failures within the term of the agreement on an on -call and emergency work for general <br />improvements, on an as needed, Task Order basis. <br />DESCRIPTION OF WORK: <br />The scope of work will vary per Task Order within the public right-of-way. It may include, but not be limited <br />to, the procurement and/or removal of materials, excavation, installation, backfill, compaction, grading, <br />sidewalk and paving, curb and gutter, fencing, guardrail, barrier, and pavement markings,striping, signs, sign <br />posts and miscellaneous other street furniture, and repairing various items within the public right-of-way, traffic <br />control, mobilization, compliance with this agreement and all other work necessary to complete on -call <br />emergency Task Orders specified per incident. <br />The work completed shall be in compliance with the City's Standard Plans, Caltrans Standard Plans and the <br />"Greenbook" and Caltrans' Standard Specifications and as specified in this agreement. Work shall also be in <br />compliance with the City's Standard Plan No. 1160, "Street Work and Utility Permit General Provisions." <br />QUANTITIES FOR FEE SCHEDULE (UNDER SEPARATE COVER): <br />For the purposes of providing a Fee Schedule based on the below Sample Task Orders, the following work items <br />and quantities are provided. The Fee Schedule in Attachment 5: <br />Each Fee Schedule shall include a schedule of the hourly billing rates for ALL contractor and subcontractor staff <br />and labor personnel. Additionally, for each discipline that a company seeks to be considered, the below table(s) <br />shall be completed. For example, if General Contractor is submitting for Asphalt Concrete and Concrete Work, <br />Sample Task Orders A and B would both be required to be completed as part of the Fee Schedule. Each table <br />shall include the filling in of the last two columns for the relevant sample task orders for whichever category(ies) <br />are being submitted for consideration. However, actual work will be paid for as described in Section I.A. "Nature <br />of Work." Sample Task Orders for Asphalt Concrete and Concrete roadway and sidewalk and related work are, <br />respectively: <br />Sample Task Order A - Asphalt Concrete <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />1 <br />Unclassified Excavation <br />550 <br />CY <br />Z Lo 2.eo14ti <br />oo <br />2 <br />AC Pavement <br />130 <br />TN <br />1rj oo <br />Oo <br />3 <br />Fumish and Install N6 Pullbox <br />4 <br />EA <br />a OD <br />n o0 <br />4 <br />Adjust Manhole to Finished Grade <br />5 <br />EA <br />— " <br />5 <br />PCC Curb and Gutter a A-2-8) <br />100 <br />LF <br />110 <br />00 <br />6 <br />Signing and Striping <br />1 <br />LS <br />—Gott <br />00 <br />7 <br />Traffic Control Work <br />I I <br />LS 143 <br />5WO 1 <br />4 go. oc <br />Page I of 8 <br />