My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RJM DESIGN GROUP, INC.
Clerk
>
Contracts / Agreements
>
R
>
RJM DESIGN GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 8:17:00 AM
Creation date
6/13/2023 8:31:28 AM
Metadata
Fields
Template:
Contracts
Company Name
RJM DESIGN GROUP, INC.
Contract #
A-2023-089-07
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
9/30/2025
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Japanese Pavilion <br />Santa Ana, CA <br />Completion Date: 2020 <br />Project Size: .2 acres <br />Design Cost: $51,500 <br />Construction Cost: $250,000 <br />Project Summary <br />Client Reference <br />Suzi Furjanic <br />Associate Park/Landscape Planner <br />City of Santa Ana <br />(714)571-4241 <br />sfurjanic@santa-ana.org <br />The Japanese Teahouse, along with its quarter -acre Japanese themed garden landscape was <br />donated to the City of Santa Ana in 1950 through donations from the Orange County Japanese <br />American community. The Teahouse/Pavilion is located within the Plaza of the Suna centrally <br />located, high -use pedestrian plaza adjacent to City and County government buildings. <br />After 50 years of weathering and public use, the teahouse structure and the adjacent landscaped <br />garden were in serious need of refurbishment and re -design. Improvements include adding <br />accessible board form concrete ramps from the plaza level into the teahouse. Deteriorating wood <br />beams, columns, and roof framing were replaced. Overhead lighting was replaced with period - <br />appropriate, vandal proof fixtures. The low wood rail fencing was replaced around the perimeter <br />of the garden area. The garden landscape area was refurbished with cobble streambeds, <br />landscaping, and cherry trees that will blossom each spring. <br />Project Team <br />Principal: <br />Project Manager: <br />Larry P. Ryan <br />Pamela Burton <br />�ommw,ryrn=o��s�s�o�,.I <br />R, j MDESIGN <br />GROUP <br />GROUP <br />12 1 City of Santa Ana • On -Call Landscape Architectural Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.