My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RJM DESIGN GROUP, INC.
Clerk
>
Contracts / Agreements
>
R
>
RJM DESIGN GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 8:17:00 AM
Creation date
6/13/2023 8:31:28 AM
Metadata
Fields
Template:
Contracts
Company Name
RJM DESIGN GROUP, INC.
Contract #
A-2023-089-07
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
9/30/2025
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUALITY CONTROL PLAN <br />Our open office "bullpen" setting is especially conducive to regular milestone reviews and <br />monitoring of a project. This review plays a central role in our quality control effort. The importance <br />of plan review, checking, and cross-checking cannot be overemphasized, given the complexity and <br />time constraints under which construction documents are often produced. Our review benchmarks <br />include: <br />Documents are comprehensively checked at key milestones and regular intervals. <br />One person checks all important dimensions, gradients and utility infrastructure. <br />The person responsible for the drawings reviews the specifications, and the specifier <br />reviews the drawings. <br />Regular consultant team meetings are held to review the documents produced by each for <br />coordination (utility, civil, electrical, etc.) <br />The Principal Landscape Architect will be ultimately responsible for all work produced <br />under his or her direction. A constant review process is implemented in all phases of the <br />work. <br />The Client is involved in reviewing plans at regular intervals and approving the construction <br />documents before they are issued for bid. <br />Another integral component in our quality control process is the utilization of our "RJM lessons <br />learned checklist." This checklist contains the learning experiences that we have encountered over <br />34 years of project development. It is a useful tool that allows us to systematically review our work <br />and that of our consultant team to ensure that we are applying the collaborative experience learned <br />to the benefit of our projects. <br />In addition to our in-house quality control efforts, we are also continually learning and applying the <br />ongoing "lessons learned" from our outside plan check services provided to multiple agencies. This <br />methodical approach to outside projects gives us the unique advantage of reviewing our own plans <br />and specifications with an impartiality that allows for a fresh and unbiased evaluation. <br />COMMUNICATIONS APPROACH <br />An assigned Project Manager from RJM Design Group for the specific project will be the main <br />Point of contact with the City for the life of the project. RJM Design group will act as the project <br />ead and main coordinator for all project deliverables. All communications from sub consultants <br />will be conducted through RJM Design Group. <br />1. Consultants can participate in online virtual meetings via Zoom, Microsoft Teams, <br />or other video conferencing applications. Meetings to be held at regular intervals during <br />the early phases of the project and continue on an as -needed basis thereafter to assess <br />progress and provide direction throughout the performance of the services and preparation <br />of the project deliverables. <br />2. RJM will prepare all meeting agendas for identified scheduled meetings with the City <br />and provide a summary of key issues with action items (meeting notes) discussed at each <br />meeting. <br />28 1 City of Santa Ana • On -Call Landscape Architectural Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.