My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RICK ENGINEERING COMPANY
Clerk
>
Contracts / Agreements
>
R
>
RICK ENGINEERING COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:04:38 PM
Creation date
6/26/2023 3:52:19 PM
Metadata
Fields
Template:
Contracts
Company Name
RICK ENGINEERING COMPANY
Contract #
A-2023-088-04
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
1/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bake Parkwav at Trabuco Road/Irvine Boulevard <br />LAKE FOREST. CA <br />As part of the Street and Traffic On -Call contract with the City of <br />Lake Forest, RICK prepared alternative studies for the addition of a <br />second eastbound to northbound left -turn lane and an eastbound to <br />southbound dedicated right turn only lane. Three alternatives were <br />completed with coordination with SCE, who has overhead facilities <br />within the right-of-way along each side of Bake Parkway, and the City <br />of Irvine. <br />Plans, Specifications & Estimates (PS&E) include: roadway widening, <br />a traffic signal modification, right-of-way acquisition, extensive dry <br />utility coordination, and required plan processing through the cities of <br />Lake Forest and Irvine. <br />Skatepark and Trail Project <br />SAN JUAN CAPISTRANO, CA <br />RICK is providing civil engineering design services <br />through a design -build contract for a 22,000 sf, <br />custom concrete skatepark project for the City of <br />San Juan Capistrano. In addition, engineering and <br />land surveying services are being provided for <br />an associated 1,550' decomposed granite multi- <br />purpose trail connecting the skatepark to a city-wide <br />trail system. The project involves coordination with <br />the City of San Juan Capistrano, Santa Margarita <br />Water District, Grindline, the general contractor, and other team sub - <br />consultants, such as the landscape architect and MEP. <br />COMPLETI�,DATE <br />On -Going (95% complete) <br />CLIENT / CONTACT <br />City of Lake Forest <br />Doug Erdman, PE <br />Assistant City Engineer <br />(949)282-5233 <br />derdman@lakeforestca.gov <br />COMPLETION DATE <br />January 2021 to Present <br />RICK's work includes the design and plan processing for on -site <br />CLIENT / CONTACT <br />and off -site water and sewer plans for the required connections to <br />Grindline Skateparks, Inc. <br />the proposed bathroom facilities. This is the second design -build <br />Matt Flue <br />gge Chief Executive Officer <br />project RICK has worked on with Grindline, the first being a skatepark <br />(206) 932-6414 <br />completed in 2019 for the City of Lake Elsinore, California. <br />matt@grindline.com <br />Key components: <br />♦ Topographic survey <br />♦ Design development support <br />♦ Topographic and utility base map <br />preparation <br />♦ Precise grading plans <br />Domestic water and sewer plans <br />Erosion control plans <br />♦ Stormwater reports (WQMP, <br />SWPPP) <br />♦ Construction cost estimate <br />® Consultation and construction <br />support <br />Quantity cost estimate <br />Plan processing <br />RICK City of Santa Ana I On -Call Engineering Services, RFP No.: 23-030 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.