Thornton Park Neighborhood <br />Water Main Replacement <br />SANTA ANA, CA <br />RICK prepared construction documents to <br />replace the existing 8" water mains in nine <br />(9) streets in this well -established Santa Ana <br />neighborhood. The total length of water main <br />replacement was 7,500 feet. <br />The plans and specifications were prepared <br />such that the existing water line was live <br />until the new water line was in place and <br />operational. Once the new water line was <br />operational, the water laterals were connected to the new 8" water <br />line. The project included preparing a base map based on as -built <br />plans, water meter service records, City GIS, and site visit surveys. <br />Work included a records search through City of Santa Ana, County <br />of Orange, and dry utility purveyors. The records research were <br />tracked by keeping a log documenting the entity, contact information, <br />date, and topic of correspondence, and date the document was <br />received or outcome. <br />The engineering design was prepared in accordance with the City of <br />Santa Ana Design Guidelines for Water and Sewer Facilities and the <br />City's CAD standards. Support was provided during the bid phase by <br />attending pre -bid and pre -construction meetings and responding to <br />contractor's request for information. <br />Aviation Boulevard Missing <br />Sidewalk Project <br />MANHATTAN BEACH, CA <br />For the City of Manhattan Beach, RICK <br />prepared construction documents to install <br />a missing sidewalk segement on the west <br />side of Aviation Boulevard, a six -lane facility, <br />for a length of 600% and reconstruct five (5) <br />ADA-compliant curb ramps. The proposed <br />sidewalk is to have a minimum width of 6.5' <br />within an existing terrain comprised of a <br />vegetated slope with mature trees, existing <br />overhead utility lines supported by wooden <br />poles, and utility vaults. The work fronts properties owned by <br />Northrup Grumman and a shopping center, and required a right- <br />of-way from each owner to meet the project's goals. Current work <br />has included coordination with the adjacent property owners for <br />property access to perform field design surveys and geotechnical <br />borings. Completed work has also included preparing and <br />distributing utility coordination request letters. <br />Ex <br />COMPLETION DATE <br />Design Start: 2018 <br />Design End: 2020 <br />Construction End: 2022 <br />CLIENT / CONTACT <br />City of Santa Ana <br />Sean Thomas, PE, QSD <br />Project Manager <br />(714)647-5655 <br />SThomas5@santa-ana.org <br />COMPLETION DATE <br />February 2022 to Present <br />CLIENT / CONTACT <br />City of Manhattan Beach <br />Marzena Laskowska, PE <br />Senior Civil Engineer <br />(310)802-5325 <br />m laskowska @ m anh atta n beach. <br />gov <br />RICK City of Santa Ana I On -Call Engineering Services, RFP No.: 23-030 17 <br />