Laserfiche WebLink
X Engineering prepared construction documents for 2500 linear feet last lane public street improvements <br />for the west side of Archibald Avenue from Merrill Avenue to Eucalyptus Avenue. Beyond the curb, the <br />design included sidewalk with curb ramps, parkways, two bus turn outs, a multipurpose trail, and a 24-foot <br />neighborhood edge that connects to a residential development. <br />Enhanced concrete pavement was designed for curbs at intersections to support heavy truck traffic. X <br />Engineering also provided management and coordination for the ultimate condition signal improvements <br />at three intersections. Signing/striping and street light plans were prepared to complement physical <br />improvements and support traffic movement. <br />Catch basins were also included within the improvement plans, which were designed to be constructed around <br />existing storm drain stubs. <br />Parkway, sidewalk and multi -use trail looking northbound on <br />Archibald Avenue <br />REFERENCE <br />AGENCY <br />City of Ontario, Engineering Department <br />DATES OF SERVICE <br />January 2018 - June 2019 <br />Last lane improvements looking southbound on Archibald Avenue <br />CONTACT <br />Jesus Placentia I Senior Associate Civil Engineer, City of Ontario, 909.395.1218 <br />13 X ENGINEERING & CONSULTING, INC. <br />