My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
X ENGINEERING & CONSULTING, INC.
Clerk
>
Contracts / Agreements
>
X
>
X ENGINEERING & CONSULTING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:17:16 PM
Creation date
6/26/2023 4:04:05 PM
Metadata
Fields
Template:
Contracts
Company Name
X ENGINEERING & CONSULTING, INC.
Contract #
A-2023-088-10
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
11/1/2023
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X Engineering prepared construction documents for the design of approximately 2700 linear feet of an 18" <br />domestic water line beneath a partially constructed roadway, Chino Avenue. The design included removal of <br />an existing 16" domestic water line and replacement with an 18" line. Additionally, removal of a connection <br />between the existing water line and a separate domestic water line within a different pressure zone was <br />required. The project team coordinated closely with the Ontario Municipal Utility Company (OMUC) to ensure <br />minimal water shut offs and to provide design solutions that would allow for future extension. <br />X Engineering prepared the design for two additional water lines within Chino Avenue which include a 12" <br />domestic water line and an 8" recycled water line. An alternative alignment study was also prepared and will <br />be presented to OMUC in an effort to find a feasible alignment for the two water lines. The preferred alignment <br />will minimize and avoid impacts to existing physical structures, eliminate the need for excess right-of-way <br />acquisition, and maintain compliance with the Division of Drinking Water requirements. <br />EX. R/W <br />EX. <br />R/W <br />FUTURE <br />R/W <br />BBB <br />44' <br />44' <br />SURFACEFUTURE FINISHED <br />OU <br />BY OTHERS <br />12' <br />32' I <br />1 32' <br />12' <br />t10' <br />EOP <br />I <br />5' 7' <br />tt51 <br />II <br />EX. <br />8' 6' 12' 6' <br />6 <br />14' <br />6' S. I <br />swu <br />I <br />--- , t_= s_2_ <br />2R <br />1 2% <br />_IL_ <br />1E%. 8" C&G <br />4.83' FUTURE 1 <br />C&G <br />16"D 8.25'8" <br />L <br />TO <br />ED(. <br />EMOVED <br />B" <br />12.88' <br />BY OTHERS <br />EB"RW <br />BY OTHERS <br />CHINO AVENUE <br />A <br />SCALE: 1"=10' <br />�] <br />G <br />FROM STA. 232+67.59 TO STA. ±247+92.46 <br />Underground wet utilities cross section in Chino Avenue <br />REFERENCE <br />AGENCY <br />City of Ontario, Engineering Department - Ontario Municipal Utility Company <br />DATES OF SERVICE <br />June 2019 - June 2020 <br />CONTACT <br />Jeff Krizek I Associate Engineer, Ontario Municipal Utility Company, 909.395.2697 <br />X ENGINEERING 8. CONSULTING, INC. 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.