Laserfiche WebLink
X Engineering prepared construction documents for 1700 linear feet of full width, 128' wide public street <br />improvements from the Cucamonga Channel to Archibald Avenue in the City of Ontario, California. The <br />improvements support a 432-lot residential development to the north and an approximately 50-acre industrial <br />development to the south. Both the north and south side of Merrill Avenue required driveway design to <br />provide appropriate infrastructure for the respective developments. In addition to standard curb pavement <br />improvements, design features included a 12' parkway with a 5' sidewalk, an 8' multi -use trail, a bus turnout, <br />and an interim design at the Cucamonga Channel junction which allows for seamless connection to a future <br />bridge expansion project. <br />Signing/striping and street light plans were prepared to complement physical improvements at the shared <br />intersection of the residential and industrial developments. Traffic signal modifications at Archibald Avenue <br />were also completed under the management of X Engineering. <br />Close coordination with the City of Ontario, multiple developers, engineering consultants, dry utility consultants <br />and construction administrators was required for the preparation of design plans in order to successfully <br />complete the Merrill Avenue public improvements. X Engineering ensured all city design standards were met. <br />Parkway, sidewalk and multi -use trail looking <br />westbound on Merrill Avenue <br />REFERENCE <br />AGENCY <br />City of Ontario, Engineering Department <br />DATES OF SERVICE <br />January 2018 - June 2019 <br />New signal improvements for Merrill Avenue and Charlotte Avenue looking north- <br />bound on Charlotte Avenue. <br />CONTACT <br />Jesus Placentia I Senior Associate Civil Engineer, City of Ontario, 909.395.1218 <br />X ENGINEERING & CONSULTING, INC. 16 <br />