Laserfiche WebLink
X Engineering provided construction documents for widening of a frontage road adjacent to Centre City <br />Parkway in Escondido, CA. The scope of work included design of 700 feet of public storm drain system to <br />connect existing median inlets to a regional storm drain system; X designed a storm drain that was considered <br />the most efficient and least invasive to the relevant stakeholders. <br />Additionally, 600 linear feet of sidewalk improvements were required to be installed to strengthen the local <br />transit network. Overhead electrical lines were also required to be undergrounded along the frontage as part of <br />development activities. <br />Construction of improvements began in February 2022. X Engineering continues to provide construction and <br />design support for the project on an ongoing basis. <br />Storm drain installation <br />REFERENCE <br />EX <br />EDGE OP <br />PAVEMENT NNE <br />IX. 41' <br />EX. WESTERLY <br />CURB LINE <br />S. ESCONDIDO CENTER UNE <br />44.5' BLVO <br />Q <br />±41' <br />�,C EX <br />O/Al <br />11'R/W <br />PROP <br />R/1Y <br />tfi' IX <br />OEDIGATI <br />IX. 35' CENTRE CRY PARKWAY <br />MEDIAN <br />±20' <br />1 22' <br />5.5 <br />4.4' <br />213.2' EX. <br />SWLK <br />PKW1 <br />PAVEMENT <br />TO REMAIN - <br />TO BE REMOVED 5 <br />MIN. f X <br />F 2 <br />EX. 10 <br />RECYCLED <br />WATER <br />IX 1T <br />WATER yin <br />- <br />FORCE SEWER <br />MAIN <br />ESCONDIDO BLVD <br />A <br />FROM STA 101+67 TO STA 104+29 <br />2 <br />STREET CIA59FlCATON: LOCAL COLLECTOR <br />APPNED TRAFFIC INDEX (TI)=•6 <br />• NOTE: TRAFFIC INDEX PER CITY OF <br />ESCONDIDO STREET DESIGN STANDARDS <br />Snapshot of entire project site including frontage street Escondido Blvd <br />AGENCY <br />City of Escondido, Engineering Department <br />DATES OF SERVICE <br />February 2021 -April 2022 <br />CONTACT <br />Owen Tunnel I Assistant City Engineer, City of Escondido, 760.839.4651 <br />17 X ENGINEERING & CONSULTING, INC. <br />