Laserfiche WebLink
Atwood Multi -Purpose Trail <br />PLACENTIA, CA 12021—ONGOING <br />The proposed Atwood Multi -Purpose Trail is 0.6 miles along <br />the Atwood Channel in the City of Placentia. The purpose <br />of this Project Approval & Environmental Document (PA/ <br />ED) phase is to identify a preferred trail alignment; explore <br />the feasibility of trail crossings at roads and railroads; <br />identify opportunities for access points that connect the <br />trail to neighborhoods, parks, schools, and transit; and <br />environmentally clear the project. Alta is providing overall <br />project management, leading the development of concept <br />plans, preliminary cost estimates, feasibility study, community <br />outreach, hydrology report, and coordinating extensively with <br />OC Flood Control District and Caltrans Local Assistance. <br />TOS 8 Curb Ramp Designs <br />LOS ANGELES, CA 12021—ONGOING <br />Alta is currently working with the Los Angeles Bureau <br />of Engineering (LABOE) on prioritized infrastructure <br />improvements that promote efficient modes of travel which <br />focus on safety, inclusion, and sustainability around the <br />City. The projects are driven by LABOE's partnerships with <br />LADOT which is utilizing Measure M and local funds to <br />enhance traffic safety at desired destinations throughout the <br />12 Council Districts in the City. The projects are the Backlog <br />Reduction Program, Vision Zero Initiative, and South Bay <br />MSP Curb Ramps, and Traffic Infrastructure Facilities which <br />includes upgrading over 180 non-ADA compliant curb ramps <br />to the City's current standard plan (S-442-6). <br />The Measure M multi -year program funding source is <br />requiring the project schedule to be condensed and <br />expedited. Knowing this, Alta is committed to the ambitious <br />schedule and is currently delivering the design on -time and <br />within budget. <br />CLIENT PROJECT MANAGER <br />City of Placentia Public Works Vincent Hellens <br />Department <br />RELEVANCE <br />CONTACT <br />Kyra Tao PE <br />PTP Transportation Manager <br />(714) 993-8121 <br />ktaogplacentia.org <br />CLIENT <br />✓ PAIED <br />✓ Trail alignment <br />✓ Cost estimation <br />✓ Hydrology report <br />alta <br />PROJECT MANAGER <br />City of Los Angeles Bureau of Steven Frieson <br />Engineering <br />RELEVANCE <br />CONTACT ✓ Stakeholder coordination <br />Kitty Sic, P.E., ENV SP <br />Street Improvement Division <br />Civil Engineer <br />(213) 485-4623 <br />kitty.siuglacity.org <br />✓ ADA pedestrian <br />Improvements <br />✓ Robust project <br />management <br />✓ Site assessments <br />15 Proposal for RFP No 23 030 On -Call Engineering S,0... ALTA PLANNING +DESIGN, INC. <br />