Laserfiche WebLink
Los Angeles River Path <br />LOS ANGELES, CA 12018—ONGOING <br />Alta is co -leading the design of the landmark Los Angeles <br />River Path. This $365 million project —one of the largest <br />active transportation trail projects in the country —will close <br />an eight -mile gap in the path along the Los Angeles River <br />(LA River) in downtown Los Angeles and Vernon. Once <br />complete, the LA River Path will be a 32-mile continuous <br />pathway for walking and biking from Long Beach to the <br />San Fernando Valley, providing a world -class facility for <br />Angelenos and the region. <br />Alta's community -driven design approach focuses on user <br />experience and legibility. With Phase 1 completed, the Alta <br />team has led Metro through an alternatives analysis process <br />that resulted in board consent and approval to move into <br />environmental clearance and conceptual engineering. Over <br />the next six years, Alta will be leading path geometrics, <br />assisting with the CEQA/NEPA process, developing <br />construction documents, supporting Army Corps and local <br />agency permitting, and providing construction support. <br />Merced Avenue Linear <br />Park and Traffic Calming <br />Improvements <br />EL MONTE, CA 12020—ONGOING <br />This two-part project includes the final design of bicycle <br />facilities and pavement repair for a series of corridors in El <br />Monte, and the creation of a linear park on Merced Avenue. <br />The linear park will be created in a new median, and will <br />feature walking and biking paths, native plantings, stormwater <br />capture, public art, shade trees, and play areas. Alta is <br />providing final Plans, Specifications, and Estimate for the <br />linear park design. The plans include curb ramp details, <br />median plan and profile plans, grading details of the trail, <br />landscape and irrigation plans, amenity details, and signing <br />and striping plans. <br />To date, Alta worked with El Monte to support grant <br />applications for construction funding, provided a range of <br />concept designs, conducted extensive public outreach, <br />and created a fly -through animation to build support for the <br />project. <br />CLIENT <br />alta <br />PROJECT MANAGER <br />Los Angeles County Emily Duchon <br />Metropolitan Authority (Metro) <br />tK�L`Y/_XIIIIII1 <br />Dolores Roybal Saltarelli <br />Deputy Executive Officer <br />(213) 922-3024 <br />roybaldometro.net <br />CLIENT <br />City of Pomona Public Works <br />Department <br />CONTACT <br />Lee Torres, PE <br />City Engineer <br />(626) 580-2055 <br />ItorresPelmonteca.gov <br />RELEVANCE <br />✓ Regional trail planning, <br />design and engineering <br />✓ Alternatives analysis <br />✓ Design guidelines <br />✓ Stakeholder engagement <br />✓ CEQA/NEPA <br />documentation <br />alta <br />PROJECT MANAGER <br />James Powell <br />✓ Streetscape design <br />✓ PS&E <br />✓ Grant planning <br />✓ CEQA documentation <br />ALTA PLANNING + DESIGN, INC. Proposal for REP No. 23-030 On Call Engineering Services 16 <br />