My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALTA PLANNING + DESIGN, INC. (2)
Clerk
>
Contracts / Agreements
>
A
>
ALTA PLANNING + DESIGN, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:19:53 PM
Creation date
6/26/2023 4:13:54 PM
Metadata
Fields
Template:
Contracts
Company Name
ALTA PLANNING + DESIGN, INC.
Contract #
A-2023-088-14
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
9/1/2023
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. References <br />We invite you to reach out to the following clients who can speak further to our qualifications and quality of service provided in <br />the last five years. <br />1. ATWOOD MULTI -PURPOSE TRAIL <br />Client: City of Placentia Public Works Department, Kyra Tao, Transportation Manager, (714) 993-8121, ktao@placentia.org <br />Type of Work: Alta is providing overall project management, leading the development of concept plans, preliminary cost <br />estimates, feasibility study, community outreach, hydrology report, and coordinating extensively with OC Flood Control District <br />and Caltrans Local Assistance. <br />2. TRAFFIC CALMING WITH CLASS IV BIKE LANES: PARKW�h*fiR. AND DENHOLM ST. <br />Client: City of El Monte, Lee Torres, City Engineer, (626) 580-2055, Itorres@elmonteca.gov <br />Type of Work: Alta is working with the City of El Monte to calm traffic and improve roadway safety on Parkway Drive and <br />Denholm Drive. This is being accomplished through the design of a Class IV Bikeway and additional traffic calming measures <br />such as removing existing speed humps and other methods as deemed appropriate. Thusfar, Alta has evaluated existing <br />conditions, facilitated community engagement, and developed conceptual and final plans. <br />3. HIGUERA ST. COMPLETE STREETS AND NEIGHBORHOOD GREENWAY I SAN LUIS OBISPO, CA <br />Client: City of San Luis Obispo, Adam Fukushima, Active Transportation Manager, (805) 781-7100, afukushimaC slocity.org <br />Type of Work: Alta worked with San Luis Obispo to support their Active Transportation Program grant application for design <br />and construction funding to implement a neighborhood greenway as well as a robust permanent Class IV bike facility along <br />Higuera Street. Alta prepared additional 10% Concept Plans for the Meadow Park Neighborhood Greenway, developed <br />rendered cross sections of the Higuera Street improvements, prepared engineers construction estimates, and provided detailed <br />analysis on the benefits the project would have. In addition, Alta is preparing final engineering plans, specifications, and <br />estimates for the project. <br />ALTA PLANNING +DESIGN, INC. Proposal for RFP No. 23030 On -Call Engineering Services 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.