Laserfiche WebLink
SD submittal and changes requested. The Alta Team will <br />prepare initial Division 22 and 23 specifications. <br />TASK 6.3 CONSTRUCTION DOCUMENTS (CD) PHASE <br />The Alta Team will prepare CD drawings based on comments <br />from previous DD submittal and changes requested. This <br />phase will consist of a 50%, 95% (Permit Set), and 100% (Bid <br />Set) CD Progress Sets. We will prepare final Division 22 and <br />23 specifications and Mechanical Energy Compliance Forms <br />(MECH and PLUMBING TITLE 24). <br />Task 6 Deliverables: Schematic Designs, load calculations, <br />SD Drawings, DD Drawings, and' D drawings including <br />specifications and estimates. <br />Task 7. Fire Protection Engineering <br />Services for Facility <br />TASK 7.1 SITE INVESTIGATION <br />This task will be supported by GHD. The schematic design <br />phase will begin with a kickoff meeting which will occur <br />concurrently with the site visit for the facility. We will conduct <br />site surveys to document existing fire sprinkler system sizing, <br />routing, and seismic bracing assemblies. <br />TASK 7.2 INITIAL SD DRAWINGS <br />The Alta Team will prepare initial SD drawings that will <br />include existing Fire sprinkler schematic and proposed fire <br />sprinkler schematic. In addition, we will prepare flow test <br />application (for entire building), initial hydraulic calculation <br />based upon flow test (for entire building), a list of Division 21 <br />specification sections, and a fire sprinkler cost estimate <br />TASK 7.3 DESIGN DEVELOPMENT PHASE <br />The Alta Team will prepare hydraulic calculations and <br />prepare DD drawings based on comments from previous SD <br />submittal and changes requested. The DD phase will also <br />include preparation of initial Division 21 specification sections <br />and cost estimates. <br />TASK 7.4 CONSTRUCTION DOCUMENTS PHASE <br />We will prepare final hydraulic calculations for the building <br />and prepare CD drawings incorporating comments from <br />the SD phase. This phase will consist of a 50%, 95% <br />(Permit Set), and 100% (Bid Set) CD Progress Sets. We <br />will prepare final Division 21 specifications and final fire <br />sprinkler construction cost estimates. We will prepare <br />written responses to plan check comments and address all <br />comments until approval for building permit. <br />Task 7 Deliverables. Hydraulic calculations, initial SD <br />Drawings, DD Drawings, and CD drawings including <br />specifications and estimates. <br />ALTA PLANNING + DESIGN, INC. Proposal for RFP No. 23-030 On -Call Engineering Services <br />