My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-07-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
07/18/2023 Regular and Special HA
>
Agenda Packet_2023-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 12:10:15 PM
Creation date
7/12/2023 11:48:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
7/18/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br />www.santa-ana.org/public-works <br />Item # 20 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Staff Report <br />July 18, 2023 <br />TOPIC: Preconstruction Engineering Services for Fairview Bridge Replacement Project <br />AGENDA TITLE <br />Approve Agreement with SYRUSA Engineering, Inc. to provide Preconstruction <br />Engineering Services for the Fairview Bridge Replacement and Street Improvements <br />from 9t" Street to 16t" Street in an Amount Not to Exceed $285,620 for a Three -Year <br />Term (Project No. 15-6827) (Non -General Fund) <br />RECOMMENDED ACTION <br />Authorize the City Manager to execute a consultant agreement with SYRUSA <br />Engineering, Inc. to provide Preconstruction Engineering Services for the Fairview <br />Bridge Replacement and Street Improvements from 9th Street to 16th Street in the <br />amount of $259,659, with a contingency of $25,961, for a total amount not to exceed <br />$285,620, for a three-year term beginning July 18, 2023, and expiring July 17, 2026, <br />with an option for one two-year extension, subject to non -substantive changes approved <br />by the City Manager and City Attorney. <br />DISCUSSION <br />Fairview Street is classified as a north -south major arterial road in the City's General <br />Plan Mobility Element and the County of Orange Master Plan of Arterial Highways. <br />Improving Fairview Street from 9th Street to 16th Street (Exhibit 1) has been a long- <br />term priority project. The proposed project would widen Fairview Street from two lanes <br />to three lanes in each direction. Additionally, the Fairview Street Bridge would be <br />replaced with a new six -lane bridge and three lanes in each direction. The new bridge <br />includes a complete bridge deck with barrier rails, sidewalks, bicycle lanes, a raised <br />landscaped median, and lighting. <br />On March 15, 2023, the Public Works Agency (PWA) released Request for Proposals <br />(RFP) No. 23-020 (Exhibit 2), by which it sought a qualified firm to provide construction <br />management services for the Fairview Bridge Replacement and Street Improvement <br />project. The scope of work includes the pre -construction phase of the construction <br />management services such as constructability review, review of the plans, <br />specifications, and cost estimate; and provides a biological survey and support during <br />the bidding period, which should take place by the end of 2023. <br />City Council 20-1 7/18/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.