Laserfiche WebLink
WA <br />Organization Chart <br />Our team's organizational structure is designed to leverage our key personnel's capabilities and expertise. <br />We have also efficiently resource loaded our pool of specialty and additional personnel, including multiple <br />options for some positions, so that we have the ability to best meet the requirements of this Project while <br />staying within the contract budget. <br />SYRUSA's Project Manager Jerry De Santos is the primary point of contact for the City. Jerry has access <br />to all of SYRUSA's construction management resources, including subconsultants, and will leverage his <br />knowledge and experience to lead our team. <br />Legend <br />Key Personnel <br />❑ SYRUSA Personnel <br />❑Subsonsultant <br />Personnel <br />Exhibit CA: Organizational Chart <br />Jerry De Santos, PE <br />Project Manager/ <br />Principal Agent <br />Carol Larsen Jose Corona, PE <br />Contract Administrator Construction Manager/ <br />Resident Engineer <br />Additional SYRUSA Staff <br />Available as Needed <br />Ryan Valentine, PE <br />Bridge Inspector <br />Robert Bersbach, PE, <br />QSD/QSP <br />Inspector/SWPP <br />Mohamad Alsheik, <br />EIT <br />Field Inspector <br />Ruth Bias, EIT <br />Field Inspector <br />Javier Martinez <br />Utility/USACE <br />Coordinator <br />Luis Negrete, PE <br />Structure <br />Representative <br />Anarea Suarez <br />(Connect) <br />Communications/ <br />Additional Subconsultants <br />Available as Needed <br />DESI Survey <br />Electrical Coast <br />Geode Twining <br />Environmental Material Testing <br />ZTC <br />Specialty/Source <br />Inspection <br />SYRUSAV ty Council 20 —119 7/18/202BE 112 <br />