My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-07-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
07/18/2023 Regular and Special HA
>
Agenda Packet_2023-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 12:10:15 PM
Creation date
7/12/2023 11:48:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
7/18/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WA <br />[0 Understanding of Need <br />PROJECT UNDERSTANDING <br />SYRUSA understands that the City is seeking a <br />qualified consulting firm to provide pre -construction <br />and construction management services for the <br />Project. <br />Project Elements <br />The Project scope of work required to replace <br />Fairview Bridge and construct street improvements <br />between 9th Street and 16th Street includes: <br />I® 9th Street to 16th Street <br />W Features <br />• Widening the roadway from two lanes to three <br />lanes on each side. <br />• Resurfacing street pavement <br />• New raised landscape median, bike lanes, <br />sidewalks, and streetlights <br />• Signing and striping <br />• Relocate of existing utilities and adjust utilities to <br />grade <br />• Water Quality Management Plan (WQMP) <br />improvements <br />1WNew Bridge Features <br />• The new bridge will include a complete bridge <br />deck with barrier rails, sidewalks, bicycle lanes, a <br />raised median, and lighting. <br />• The proposed bridge will be expanded from <br />approximately 52 ft to 100 ft in width and will have <br />the same roadway profile as the existing bridge. <br />The eight pier walls that support the existing <br />bridge will be removed, and four new pier walls <br />will be constructed to support the new bridge. <br />Maintaining two southbound lanes and one <br />northbound lane during construction. <br />Project Objectives <br />• Increase safety for pedestrians, bicyclists, and <br />motorists. <br />• Provide sidewalk and crash rated barrier rails on <br />the bridge. <br />• Greater public access with ADA improvements <br />and dedicated bike lanes <br />• Reduce traffic congestion and provide traffic <br />calming features. <br />• Compliance with Complete Streets Act <br />(accommodates all users including pedestrians, <br />bicyclists, transit users, and motorists) <br />• Consistent with the Orange County Master Plan <br />of Arterial Highways and the City's General Plan <br />Circulation Element. <br />• 500 working day construction project <br />A critical component of our Project approach is <br />to anticipate, mitigate, and resolve project issues <br />early. Leveraging our understanding of the Project, <br />our team has included a list of challenges that could <br />result from potential issues on this Project and our <br />solutions in Exhibit D.1 on page 14. <br />"SYRUSAteammembeis that worked <br />on the Auto Center Grade Separation <br />Projectwere professional, and verypatient <br />given the extensive coordination (with <br />over seven differentparties) required for <br />the construction ofthe grade separation <br />bridge. The SYRUSAteamare thorough, <br />detailed, knowledgeable and totally <br />complement each other and workas a well <br />oiled machine." <br />Linda Bazmi, Senior Engineer <br />City ofCorona Public Works <br />SYRU A oundl 20 - 120 7/18/2023 PAGE 113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.