My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-07-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
07/18/2023 Regular and Special HA
>
Agenda Packet_2023-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 12:10:15 PM
Creation date
7/12/2023 11:48:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
7/18/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D.3: Tasks and Deliverables <br />•• <br />• <br />•• <br />1 <br />Constructability Review: Meet with the project <br />Review completed constructability review providing comments and <br />Cost increase or <br />Review contract documents and clarify before <br />Resident Engineer, <br />manager and designer as well as preforming <br />recommendations. <br />schedule delay due to <br />going out to bid for construction. <br />Structure Representative <br />field visits. <br />constructability issues. <br />2 <br />Construction Sequence: Review the <br />Create an independent construction schedule with staging and <br />Cost increase or <br />Independent schedule compared to planned <br />Resident Engineer, <br />construction sequence crucial for completing <br />durations. <br />schedule delay due to <br />schedule to identify and discrepancies. <br />Structure Representative <br />the improvements in the construction contract. <br />construction sequence <br />issues. <br />3 <br />Utility Relocation Assistance: AT&T conduit <br />Utility log. Materials list for temporary water line. Soil parameters in <br />Schedule delay due to <br />Review utility agreements to confirm scope <br />Resident Engineer, <br />for future use, 12" water line, Jack and Bore <br />anticipation of shoring. <br />utility coordination. <br />and timing. Verify utility locations. Create a <br />Structure Representative, <br />receiving pit. <br />materials list for temporary water line. Review soil <br />Utility Coordinator <br />parameters in anticipation of shoring. <br />4 <br />Bid Documents: Review measurement and <br />Biddable and buildable contractual documents, and provide bid <br />Bidder Inquires not <br />Visit the site and verify contractual documents to <br />Resident Engineer, <br />payment sections of the specifications to <br />tabulations, cross referenced with contractual documents (add <br />responded accurately or <br />provide accurate and timely responses. <br />Structure Representative <br />ensure bid items cover specified work. <br />specifications) <br />in a timely manner <br />5 <br />Quantity Take -off: <br />Implement a Quantity Take -off of all items of work on the Project. <br />Additional cost or <br />Independent quantity calculations of bid items. <br />Resident Engineer, <br />claims, due to item <br />Structure Representative <br />quantity errors. <br />6 <br />Budget: Budget control measures initiated <br />Updated cost estimate and comments on contract documents. <br />Additional cost due <br />Prior to construction advertisement, verify <br />Resident Engineer, <br />through pre -bid review to develop contract bid <br />to cost estimate and/ <br />and updated as needed the cost estimate and <br />Structure Representative <br />documents for the purpose of obtaining highly <br />or contract document <br />contract documents. <br />competitive bids. Update and modify the cost <br />errors, like differing site <br />estimate and contract documents according to <br />condition. <br />the findings. <br />7 <br />Itemized List of Findings: Analyze project to <br />SYRUSA will provide issues log, risk register, schedule evaluation and <br />Utility delays, Precast <br />Review the plans and contract documents, <br />Resident Engineer, <br />proactively resolve issues that may delay the <br />suggested enhancements to expedite the project. <br />girder procurement, <br />communicate expectations with contractor, <br />Structure Representative <br />project. <br />permit compliance, <br />evaluating schedule, and monitor for compliance. <br />aesthetics, stage <br />construction and traffic <br />handling, and bridge <br />removal. <br />8 <br />Site/Field Visits: Perform visits to the field. <br />Provide photo documentation of field conditions for accurate plans. <br />Claims, delays, and <br />Utilizing drone services and lidar technology to <br />Resident Engineer, <br />additional costs <br />identify current field conditions and continuity with <br />Structure Representative, <br />plans. <br />Drone Pilot <br />9 <br />Material and Method Improvements: <br />Propose a list of materials and methods to improve the project. <br />Contractor proposes a <br />By proposing material and methods prior to <br />Resident Engineer, <br />cost savings that the <br />construction advertisement, the City benefits from <br />Material Testing Engineer <br />owner would pay for. <br />the savings. <br />10 <br />Geotechnical Report and Structure <br />Review completed constructability review providing comments and <br />Cost increase or <br />Review contract documents and clarify before <br />Resident Engineer, <br />Calculations: <br />recommendations. <br />schedule delay due to <br />going out to bid for construction. <br />Geotechnical Engineer <br />constructability issues. <br />11 <br />Environmental Compliance: Analyze <br />List of constructability review comments for the environmental <br />Environmental delays or <br />Providing constructability review comments <br />Resident Engineer, <br />NEPA and CEQA documents to assure all <br />documents. Prepare any pre -construction reporUwork plan and <br />shutdowns. <br />for the environmental documents prior <br />Environmental Specialist <br />environmental compliances are met and <br />monitor contractor's mitigation compliance work performed. <br />to advertisement. Prepare any pre - <br />monitored <br />construction report/work plan and monitor <br />prior to advertisement. Contractor's mitigation <br />compliance work performed. <br />12 <br />Permits: Assure that the contractor has-1 <br />Accurate and complete permits. Environmental commitments records <br />Permits are approved <br />Review all required permits and assure all <br />Resident Engineer, <br />applied conforms with all permits. (County, <br />for example, noise, hazardous material, biological resources, and <br />and finalized to avoid <br />requirements are met. <br />Structure Representative <br />USACE, and AQMD) <br />I cultural resources if needed. <br />delays. <br />City Council <br />SYRUSA$-Z <br />20 — 126 <br />7/18/2023 <br />PAGE 119A <br />