Exhibit D.3: Tasks and Deliverables (continued) <br />13 <br />Project Phasing/ Detouring: Review and <br />List of constructability review comments to meet the USACE and <br />Cost increase or <br />Review contract documents and clarify before <br />Resident Engineer, <br />understand permits in conjunction with project <br />OCFC permission to perform work in the riverbed's mitigation <br />schedule delay due to <br />going out to bid for construction. <br />Structure Representative, <br />phasing and detouring for construction for <br />compliance work performed. <br />constructability issues. <br />Environmental Specialist <br />compliance. <br />14 <br />Materials Testing, Source Inspection, and <br />All material test results will be in accordance with the Contractual <br />Cost increase or <br />All material test results will be in accordance with <br />Resident Engineer, <br />Geotechnical Services: SYRUSA will oversee <br />Documents and test methods. Failing test will be immediately reported <br />schedule delay due to <br />the Contractual Documents and test methods. <br />Structure Representative, <br />our subconsultants work for materials testing, <br />to the Resident Engineer. <br />materials issues. <br />Failing test will be immediately reported to the <br />Material Testing Project <br />source inspection, and geotechnical services. <br />Resident Engineer. <br />Manager, Source <br />Inspection PM, Source <br />Inspection SMR <br />15 <br />Schedule: To successfully complete the <br />Provide an updated and reasonable construction schedule. <br />Cost increase or <br />Review detailed CPM schedule developed by <br />Resident Engineer, <br />Project. <br />schedule delay due to <br />SYRUSA. Provide recommendations to City of <br />Structure Representative <br />schedule issues. <br />Santa Ana for a safe completion and ways to <br />save time and money. <br />16 <br />Bidding Period Support: Provide support as <br />Provide support during bidding period, including addenda and <br />Cost increase or <br />Providing detailed responses to bidder questions <br />Project Manager, Resident <br />needed. <br />answering any questions from bidders, and attend pre -bid job walk, if <br />schedule delay due to <br />prior to advertisement. <br />Engineer, Structure <br />required. <br />constructability issues. <br />Representative, Office <br />Engineer <br />17 <br />Contract Award: Review bids for completeness <br />Provide support and recommendation to City of Santa Ana for <br />Avery low bid because <br />Thorough review of contractual documents. <br />Resident Engineer, <br />and responsiveness. Review contractor <br />successful award. <br />of error on plans. <br />Addressing changes quickly and resolve at lowest <br />Structure Representative <br />references, sureties, licenses, insurances, and <br />cost. <br />good standings per the Caltrans LAPM, and <br />city requirements. <br />18 <br />Pre -construction Meetings: Lead pre- <br />Prepare agenda and conduct pre -construction "kick-off meeting". <br />Cost increase or <br />Identify roles and responsibilities and required <br />Project Manager, Resident <br />construction "kick off' meetings prior to NTP <br />Coordinate and invite contractor, all agencies, and utility companies <br />schedule delay due to <br />documents. <br />Engineer, Structure <br />with designers, Utility companies, and City. <br />involved in the Project. <br />schedule issues. <br />Representative <br />19 <br />Caltrans LAPM Pre -award Package: <br />Prepare federally funded project pre -award package using Caltrans <br />Loss of federal funding. <br />Strict adherence to the Caltrans LAPM. <br />Project Manager, Resident <br />Local Assistance Procedures Manual documents and forms. <br />Engineer, Structure <br />Representative <br />20 <br />Office Engineering: meeting minutes and <br />SYRUSA will provide meeting notes and minutes according to office <br />Miscommunication <br />Preparing meeting notes and minutes, with <br />Office Engineer. <br />notes will be managed by SYRUSA. <br />engineering category 22- meetings of job records. <br />and delays due to not <br />tracking logs. Emailed to all participants and <br />following action items. <br />stakeholders. With continuous follow-up. <br />1 <br />Shop drawings and submittals: Review and <br />Process and monitor the status of submittals. Submittal tracking will <br />Cost increase or <br />Continuous logging and tracking, so all timelines <br />Project Manager, Resident <br />track required shop drawings, RFIs, mix <br />be introduced into Procore and status of submittals will be known at <br />schedule delay and/ <br />are met by responsible party. <br />Engineer, Structure <br />designs, materials, and product submittals for <br />all times. The PM will review the completeness and quantity of all <br />or cost increase due to <br />Representative, Office <br />completeness. <br />required shop drawings, RFIs, mix designs and materials and other <br />submittal delays. <br />Engineer <br />submittals received during the construction phase and transmit to City <br />staffing for review and approval. <br />2 <br />Procore: Monitor and implement Procore <br />Store all documents related to the project including but not limited <br />Failing a job record <br />PM will conduct internal audits to verify proper <br />Project Manager, Resident <br />software to manage all aspects of construction <br />to, submittals, RFIs, shop drawings, RFI's contract documents, <br />audit and losing <br />documentation retention. <br />Engineer, Structure <br />management. <br />inspections, drawings, photos, and any type of daily or weekly reports. <br />funding. <br />Representative, Office <br />Engineer <br />3 <br />Pre -construction meeting: Weekly meeting to <br />Lead pre -construction meeting and schedule and conduct weekly <br />Miscommunication <br />A pre -construction meeting with all project <br />Resident Engineer, <br />discuss construction progress, procedures, <br />construction and progress meetings to discuss such matters as <br />and delays due to not <br />stakeholders and emergency services will be <br />Structure Representative, <br />problems, and scheduling. <br />procedures, progress, problems and scheduling. Will prepare <br />following action items. <br />held to address contract administration items <br />Office Engineer <br />and promptly distribute minutes. <br />and project concerns. Lead as a separate labor <br />compliance meeting to discuss requirements, <br />submittals, and expectations. <br />City Council 20 — 127 <br />SYRUSA R <br />7/18/2023 <br />PAGE120A <br />