My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-07-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
07/18/2023 Regular and Special HA
>
Agenda Packet_2023-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 12:10:15 PM
Creation date
7/12/2023 11:48:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
7/18/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WA <br />Schedule <br />Our team has evaluated the plans and developed a <br />schedule tomcomplete the project based upon the <br />scope of work detailed in the RFP, Exhibit 2.1 on <br />page 39. <br />The schedule uses January 1, 2024, as a <br />benchmark date for NTP. Incorporating the time <br />of construction award to NTP for the contractor to <br />submit the required submittals. The SYRUSA Team <br />proactively works with the contractor to identify the <br />submittal and incorporates review times into the <br />schedule. <br />=111, If1� <br />-MO--� Ml , <br />The Fairview bridge work is the critical path, the <br />SYRUSA Team, as bridge experts will work with the <br />contractor to complete the project before the specific <br />500 working days. <br />Task1 1, Pre -construction services will be <br />accomplished upon receiving NTP from the City, to <br />allow as much time to for our reviews and analysis <br />to be incorporated into the Contract Documents for <br />advertisement of construction bidding. Not only does <br />understanding the schedule allow for successful <br />completion, cost -savings allows the SYRUSA Team <br />to staff the project as needed to cover any peaks <br />and provide a very cost savings team to the City. <br />SYRUSAV ty Council 20 — 146 7/18/200E 138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.