Laserfiche WebLink
➢ Materials: <br />• Local materials when possible <br />• Materials with smaller carbon footprint <br />• Green methodologies and materials where logical <br />• Long-lasting, durable <br />➢ Budget: <br />The construction budget is anticipated to be approximately $3,000,000, separate from design, <br />permitting, and construction administration fees, <br />20-Year Master Plan rendering: <br />Proposed Site: <br />City of Santa Ana RFP 23-033 <br />Page Al-3 <br />