My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Resolution Adopting Local CEQA Guidelines Resolution
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/01/2023 Regular and HA
>
Item 22 - Resolution Adopting Local CEQA Guidelines Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 4:21:46 PM
Creation date
8/9/2023 3:44:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
22
Date
8/1/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Guidelines for Implementing the <br />California Environmental Quality Act (2023) TYPES OF EIRS <br /> <br /> <br />2023 City of Santa Ana Local Guidelines 8-4 ©Best Best & Krieger LLP <br />8.05 SUPPLEMENTAL EIR. <br />The City may choose to prepare a Supplemental EIR, rather than a Subsequent EIR, if any <br />of the conditions described in Local Guidelines Section 8.04 have occurred but only minor <br />additions or changes would be necessary to make the previous EIR adequately apply to the project <br />in the changed situation. To assist the City in making this determination, the decision-making <br />body should request an Initial Study and/or a recommendation by Staff. The Supplemental EIR <br />need contain only the information necessary to make the previous EIR adequate for the project as <br />revised. <br />A Supplemental EIR shall be given the same kind of notice and public review as is given <br />to a Draft EIR but may be circulated by itself without recirculating the previous EIR. <br />When the decision-making body decides whether to approve the project, it shall consider <br />the previous EIR as revised by the Supplemental EIR. Findings shall be made for each significant <br />effect identified in the Supplemental EIR. <br />(Reference: State CEQA Guidelines, § 15163.) <br />8.06 ADDENDUM TO AN EIR. <br />The City shall prepare an Addendum to a previously certified EIR, rather than a Subsequent <br />or Supplemental EIR, only if changes or additions to the EIR are necessary, but none of the <br />conditions described in Local Guidelines Section 8.04 or 8.05 calling for preparation of a <br />Subsequent or Supplemental EIR have occurred. Since significant effects on the environment were <br />addressed by findings in the original EIR, no new findings are required in the Addendum. <br />An Addendum to an EIR need not be circulated for public review but should be included <br />in or attached to the Final EIR. The decision-making body shall consider the Addendum with the <br />Final EIR prior to making a decision on a project. A brief explanation of the decision not to prepare <br />a Subsequent EIR or a Supplemental EIR should be included in the Addendum, the Lead Agency’s <br />findings on the project, or elsewhere in the record. This explanation must be supported by <br />substantial evidence. <br />(Reference: State CEQA Guidelines, § 15164.) <br />8.07 STAGED EIR. <br />When a large capital project will require a number of discretionary approvals from <br />governmental agencies and one of the approvals will occur more than two years before <br />construction will begin, a Staged EIR may be prepared. The Staged EIR covers the entire project <br />in a general form or manner. A Staged EIR should evaluate a proposal in light of current and <br />contemplated plans and produce an informed estimate of the environmental consequences of an <br />entire project. The particular aspect of the project before the City for approval shall be discussed <br />with a greater degree of specificity. <br />When a Staged EIR has been prepared, a Supplemental EIR shall be prepared when a later <br />approval is required for the project and the information available at the time of the later approval
The URL can be used to link to this page
Your browser does not support the video tag.