Laserfiche WebLink
1d. Understanding of Need <br />PART I - CONCEPT PLANNING <br />Memorial Park East End Master Plan and Aquatic <br />Center Concept Design <br />30% PS&E (Preliminary Design/Concept Planning) <br />A successful master planning and design process supports dialogue be- <br />tween all parties and pursues consensus -based decision -making. To that <br />end, visioning, programing, master planning and conceptual design for the <br />Memorial Park - East End Master Plan + Reimagined Aquatic Center will <br />require els+swa to work closely with the City of Santa Ana Public Works <br />Agency, Park Services Division (Santa Ana PWA, PSD), and other stake- <br />holders, such as the Santa Ana Memorial Park Neighborhood Association, <br />or others as deemed appropriate by the City of Santa Ana. The intent is to <br />achieve, through work sessions and cooperative collaboration, a consen- <br />sus -based vision, program, and design framework, which will quickly and <br />effectively be applied to the Memorial Park Master Plan + Reimagined <br />Aquatic Center. Our approach to this critical initial effort is based upon the <br />following five components: <br />1. Design Communication in Multiple Languages: Communicating to <br />the widest possible audience during the visioning, programming, mas- <br />ter planning and conceptual design effort requires a team with deep <br />cross-cultural understanding and a strong awareness of the communi- <br />ty's diverse composition. We understand that Spanish and English are <br />commonly spoken by people living in City of Santa Ana, many of whom <br />frequent Memorial Park. The els+swa team includes architects, <br />landscape architects and design professionals who are fluent in Span- <br />ish and the community engagement process, and who will participate <br />as "project ambassadors" to establish a welcoming and inclusive tone <br />and to encourage greater community participation in a robust charrette <br />process. <br />2. Creative Planning: Preparation of the visioning, programming, mas- <br />ter planning and conceptual design effort requires a project tea' <br />combines strength of analysis with expertise in park planning, commu- <br />nity recreation and aquatics center design, and LEED/Zero Net Energy <br />(ZNE) strategies. Effective planning begins with the ability to analyze <br />complex conditions, identify key opportunities and constraints, and <br />formulate creative solutions. The els+swa team, in collaboration with <br />stakeholders, will quickly select alternate concepts for enhancing the <br />east portion of Memorial Park. We will evaluate, test, and collabo- <br />ratively select a preferred Memorial Park - East End Master Plan + <br />Reimagined Aquatic Center Concept, which will embody the opti- <br />mal planning and design response to functional, financial, visual, and <br />environmental requirements to help achieve a successful conceptual <br />design and associated cost estimate. <br />Unplugged Design (ZNE): With sustainability always in mind, <br />els+swa' projects start from the premise that buildings should be de- <br />signed to perform independently from any building system. We orient, <br />shape, and shade buildings to maximize daylighting, to reduce heat <br />gain in summer while allowing it in winter, and to take advantage of <br />natural ventilation when useful. This bioclimatic approach allows us to <br />eliminate or minimize building systems to reduce the need for on -site <br />renewable energy production. Optimizing building envelopes reduces <br />loads and supplies the right amount of thermal mass to make buildings <br />comfortable for occupants while requiring little energy for building sys- <br />tems. In developing our conceptual design package, we will perform <br />a detailed site and climate analysis as the basis of our ZNE approach. <br />By understanding the opportunities inherent in the eastern portion of <br />the Memorial Park site, we can choose design strategies that take <br />maximum advantage of the site and climate to reduce building loads <br />and supply on -site energy. <br />Placemaking Design: To realize the full potential envisioned for the <br />Memorial Park - East End Master Plan + Reimagined Aquatic Cen- <br />ter via the visioning, programming, master planning and conceptual <br />design process, els+swa will identify and build on existing and future <br />park and aquatic center physical connections, patterns, and systems. <br />To this end, we will prepare a final conceptual master plan that creates <br />a strong yet flexible framework that addresses Santa Ana's circulation <br />requirements and presents a master planning strategy and architectur- <br />al image that ensures a memorable and enduring place. <br />CEQA/NEPA - Realistic Solutions/Problem Solving: Successful <br />development concepts require visionary yet realistic planning that <br />meets social, economic, and physical design goals, leading to a mas- <br />ter plan that can be successfully CEQA/NEPA-certified. The visioning, <br />programming, master planning and conceptual design for the Memo- <br />rial Park - East End Master Plan + Reimagined Aquatic Center will <br />account for political, economic, and functional realities. els+swa will <br />work closely with the City of Santa Ana and the Parks and Recreation <br />Commission, and other key stakeholders to ensure a functional and <br />feasible concept. Most importantly, a Memorial Park - East End <br />Master Plan + Reimagined Aquatic Center Concept that earns <br />CEQA/NEPA certification by the City Council, by dates required for <br />funding per the American Rescue Plan Act (ARPA), as well as com- <br />pleting the Construction Documents for Phase I, Aquatics Facility, for <br />public advertisement and bid by April 2024. <br />Our approach to completing PART 1, Task 1 and Task 2, per the RFP is <br />proposed below. Based on several assignments similar in many aspects <br />to yours, we would like to offer a more detailed and tailored outreach, <br />master planning and concept effort that we believe will support a success- <br />ful Memorial Park - East End Master Plan + Reimagined Aquatic Center <br />Concept design process. We intend to submit all the deliverables listed <br />under Task 1 — Preliminary Concept Planning and Task 2 — Final Concept <br />Plan, but just in a slightly different order. Accordingly, we hope you like the <br />proposed program outlined below. Of course, we are open to discussing, <br />modifying, and adjusting this program to meet the City of Santa Ana's spe- <br />cific needs. We believe our community engagement and concept design <br />effort will result in the most robust, community informed community de- <br />sign process for the Memorial Park - East End Master Plan + Reimagined <br />Aquatic Center Final Concept. <br />TASK 0 — CEQA/NEPA <br />Rincon's work scope involves the preparation of an IS-MND CEQA and an <br />EA under NEPA. We anticipate that these are the appropriate CEQA and <br />NEPA documents; however, if our analysis determines that the project may <br />have a potential significant and unavoidable environmental impact, Rincon <br />will contact els+swa, who will in turn contact the City of Santa Ana, to im- <br />mediately determine an appropriate course of action, including preparation <br />of a project EIR, if warranted. <br />Following is an outline or Rincon's proposed effort, which falls under PART <br />1 and Part 2 and the effort approximately coincides with the completion of <br />100% Construction Documents. For detailed description of Rincon's scope <br />and fees, we have included a copy of their proposal with our sealed fee <br />proposal. <br />Task 0.1 - CEQA/NEPA Initiation and Kickoff Meeting <br />TASK 0.2 - TECHNICAL ASSESSMENTS <br />Required for both CEQA and NEPA compliance. <br />02.1 Cultural Resources Technical Report <br />Required for CEQA compliance. <br />02.2 <br />Transportation Impact Assessment <br />02.3 <br />Air Quality and GHG Emissions <br />02.4 <br />Biological Resources <br />02.5 <br />Geology and Soils <br />02.6 <br />Noise <br />Task 0.3 - NEPA Compliance <br />03.1 Administrative Draft EA/FONSI <br />03.2 Public Review Draft & Final EA/FONSI <br />Task 0.4 - CEQA Compliance <br />04.1 Administrative Draft IS-MND <br />04.2 Public Draft IS-MND <br />