Laserfiche WebLink
04.3 Final IS-MND <br />Task 0.5 - Public Hearings and Notice of Determination <br />Task 0.6 - Project Management <br />TASK 1 — PRELIMINARY CONCEPT PLANNING <br />Task 1.1 Project Understanding and Confirmation <br />Task 1.1.1 Background Document Review 1 Site Reconnaissance <br />In addition to our review of documentation made available thus far, els+swa <br />will review and evaluate additional pertinent documentation, including pre- <br />programming information, plans, inventories, studies, etc., to understand the <br />content of previous studies and the existing context, including the extensive <br />efforts by the City to gain familiarity with hot button development issues with <br />the Memorial Park East End Master Plan + Reimagined Aquatic Center <br />site and project. We will build upon our knowledge gathered during the <br />RFP process, as well as our familiarity with Memorial Park and surrounding <br />context. Our base data and archival history of Memorial Park, gained <br />through our site visits, will be supplemented by a photographic survey of the <br />existing conditions of the site. <br />Task 1.1.2 Opportunities & Constraints Analysis <br />els+swa will create a series of diagrams and maps that communicate <br />our analysis and understanding of the Memorial Park East End Master <br />Plan+ Reimagined Aquatic Center study area and its surroundings, and <br />we will use this analysis to develop our current preliminary thinking of the <br />program and site. These graphic products will assimilate collected data <br />and clearly identify opportunities and constraints and will be utilized in our <br />Program and Design Confirmation Workshop Series. Among the issues to <br />be analyzed are goals for improving, enhancing connection between the <br />Memorial Park Pool and the adjacent Memorial Park amenities; traffic flow <br />and parking as it relates to South Flower Street, West Anahurst Place and <br />West Saint Gertrude Place; master planned circulation systems; overall <br />design character (linkages and nodes) and architectural character; "hard - <br />soft" open space analysis; development opportunities and constraints; and <br />other site issues as appropriate. <br />Task 1.1.3 Draft Program Based Upon RFP Information <br />els+swa will produce a draft program based upon els+swa benchmarking <br />resources and information provided thus far. The purpose of the draft is to <br />confirm the current program thinking, and to determine the level of further <br />programming study needed. If additional study or programming is needed, <br />we understand that the Santa Ana PWA, PSD, will provide such direction. <br />Deliverables for Task 1: Draft work plan, schedule, explanatory maps, and <br />diagrams identifying development opportunities and constraints and draft <br />program. <br />TASK 1.2 KICK-OFF, SITE WALK, ASSESSMENT AND PROGRAM <br />ANALYSIS <br />Task 1.2.1 Project Kick -Off Meeting 1 Site Walk <br />els+swa will meet with the Santa Ana PWA, PSD, and others as directed by <br />the Santa Ana PWA, PSD to develop project milestones, a project schedule <br />and a plan for community outreach and engagement. This will establish a <br />mutual understanding of roles, responsibilities, and paths of communication, <br />as well as clarify the scope, issues, and objectives of the work program — <br />specifically, what are the unique development opportunities beyond those <br />identified in the RFP. In addition to initiating the project, els+swa and <br />certain els+swa consultants will do a "site walk" with Santa Ana PWA, PSD <br />members to further familiarize ourselves with the general physical conditions <br />of both sites. A Preliminary Project Schedule will be presented with task and <br />milestone targets to confirm previously targeted milestone dates, including <br />targeted completion date. <br />Product: Refined Scope and Schedule as necessary. <br />Client Input: Background materials and studies. <br />Task 1.2.2. Coordination & Consultation with Santa Ana PWA, PSD <br />els+swa will coordinate and regularly consult with Santa Ana PWA, PSD <br />to ensure that necessary information and documentation are received, <br />reviewed, and incorporated with the work product in a timely manner. Santa <br />Ana PWA, PSD may choose to involve representatives from interested <br />government agencies, other consultants to the Santa Ana PWA, PSD and/or <br />key stakeholders in these meetings. Our proposed scope includes all video <br />conference calls, other forms of electronic and telephonic communication, <br />and as -needed unscheduled meetings with Santa Ana PWA, PSD/els+swa <br />over the proposed project timeframe. <br />Product. Participation in meetings identified in the work plan. <br />Client Input: Attendance / participation in Project Administration Meetings. <br />TASK1.3—COMMUNITYOUTREACH, ENGAGEMENT, PROGRAMMING <br />AND CONCEPT DESIGN <br />Task 1.3.1 Coordinate with Key Stakeholders. <br />els+swa, in collaboration with Santa Ana PWA, PSD, will coordinate <br />meetings with Memorial Park Community Stakeholders to discuss goals <br />and garner input regarding the community engagement strategies <br />as the project moves forward. With the confirmation and approval by <br />the Santa Ana PWA, PSD, key stakeholders could include Santa Ana <br />Councilmembers and Commissioners, Santa Ana City Department <br />Leaders, service organizations, local community leaders, residents, and <br />other advocacy groups that reflect the demographics and perspectives of <br />the community. <br />Task 1.3.2: Develop a Community Outreach Plan. <br />With input from the Key Stakeholder meetings in Task 1.3.1, els+swa, <br />together with the Santa Ana PWA, PSD, will develop a Community <br />Outreach Plan that outlines the steps to engage community members. <br />The Community Outreach Plan will build upon the work completed through <br />previous engagement processes and refine community interests. The plan <br />will include a schedule with timing for release, distribution, and placement <br />of publicity items, and a list of potential co-sponsors and co -promoters to <br />assist with outreach and organizing of festive activities (e.g., donated local <br />food and entertainment) to maximize participation and positive input at <br />community events. <br />Produce Materials: <br />els+swa will produce e-flyers and e-posters publicizing events for <br />community -wide distribution. <br />Distribute Materials: <br />Local businesses and religious and service organizations will <br />be solicited to distribute flyers and information about the events <br />through their networks. With the approval of Santa Ana PWA, <br />PSD and the school district, all campuses within the district will <br />be solicited to promote events to the student body and families <br />(flyers, newsletters, etc.). Information about the project will also be <br />circulated via social media and the City's website. All solicitations <br />above will be executed by the City of Santa Ana staff. <br />Media Outreach: <br />Announcements and press releases will be distributed to local <br />media. els+swa will assist with all press announcements but will <br />require a designated City staff member to comment and approve all <br />announcements and press releases before issuance by els+swa. <br />Task 1.3.3: Community Works hops/Charrettes/Prog ram and Concept <br />Development. <br />We suggest that each workshop be held at a consistent time and day of <br />the week and that it be widely published in local media outlets and on <br />social networks. We encourage the sessions to be streamed live and <br />archived to allow a broad range of availability to those who are not able <br />to attend live sessions, which is critical to the success of any engagement <br />process, and the Memorial Park East End Master Plan + Reimagined <br />Aquatic Center Design Process is no exception. At this point we are <br />planning to facilitate three Community Workshops. Should we need to add, <br />drop, or modify sessions, we are prepared to do so once the Santa Ana <br />PWA, PSD and els+swa have a clearer understanding of the need. <br />Each workshop is preceded by a preview session with the Santa Ana PWA, <br />PSD, and any others as directed by the Santa Ana, PWA, PSD. The goal <br />of each preview session is to give attendees a sense of the upcoming <br />community workshop and confirm goals and objectives. This is also a <br />chance to finalize the agenda for publication and distribution to the broader <br />